BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Tabor City, North Carolina. Contact the soliciting agency for additional information.

Engineering services shall include, but are not limited to, standard tasks necessary for the implementation of the project in conformance with the CDBG program and NCDEQ compliance areas: 1. Preparing and approval of the engineering report prior to the Release of Funds Upon the Release of Funds, the following scope of work is required: 1. Preparing the final design and construction bid package in conformance with applicable regulations and requirements; 2. Supervising the bid advertising, tabulation, and award process, including preparing the advertisements for bid solicitations, conducting pre-bid meeting, conducting bid opening, and issuing the notice to proceed; 3. Conducting the pre-construction conference; 4. Surveying, field staking, on-site supervising of construction work, and preparing inspection reports; 5. Reviewing and approving all contractor requests for payment, change orders, and submitting approved requests to the governing body; 6. Providing reproducible plan drawings to the Town/City/County upon project completion; 7. Conducting final inspection and testing; 8. Submitting certified "as-built" drawings to appropriate authorities; and 9. Preparing an operation and maintenance manual (if applicable). The Town of Tabor City has received a Community Development Block Grant - Infrastructure (CDBG-I) award in the amount of $1,000,000 by the North Carolina Department of Environmental Quality (NCDEQ) for the rehabilitation of all four of the Town's groundwater supply wells, including the replacement of all electrical components and a new SCADA system at all four wells, in addition to a new emergency standby generator at two wells. Contingent upon this award, the Council is soliciting requests for qualifications for professional engineering services to assist the Town in both a) developing a final engineering report, and b) subsequent engineering design and bid package services and construction inspection services, of this project in compliance with all applicable federal requirements and regulations under the CDBG program. Payment terms will be negotiated with the selected firm. The fee for professional engineering services will be paid with CDBG funds. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
41
Bidding Soon
444
All Active Projects
207
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2025

img_map_placeholder

Multiple Locations, Tabor City, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.