Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 22, 2024 at 7:00 PM
Updated November 23, 2024
Site work for a mixed-use development in Los Angeles, California. Conceptual plans call for site work for a playground / park / athletic field and water / sewer project.
The Hollenbeck Park Lake Rehabilitation Project is a proposed project led by the City of Los Angeles, Department of Public Works, LA Sanitation and Environment (LASAN) in partnership with the City of Los Angeles Recreation and Parks Department (RAP) to implement a regional multi-benefit stormwater project in Hollenbeck Park and the adjacent neighborhood. The goal is to improve water quality in the Boyle Heights neighborhood, Hollenbeck Park Lake (Lake), and the Upper Los Angeles River Watershed (ULAR). This project proposes multi-benefit components consisting of stormwater diversions, capture and treatment structures, and green street network components, the project will enhance the community. Proposed green street elements within the watershed will improve air quality and provide aesthetically appealing green spaces for residents to enjoy year-round. The addition of about 50 trees in the park and the surrounding area will provide shade, reduce heat island effect, and cool the area for pedestrians and people engaged in active recreation. Any stormwater capture structures such as drywells or subsurface storage units will be mostly unseen from the surface (aside from a few covered access holes). These structures will reduce flooding, especially during significant storm events. Constructed wetlands and recirculation will provide water quality and community benefits. Overall, these improvements will be a newer, fresher, and greener revitalization to this neighborhood, all without displacing any residents or businesses. Per the owner, as of November 22, 2024, this project is in the pre-design phase. Owner states that the contract to award a design team is still on-going. The owner states that construction is currently anticipated to begin in 2028.
Conceptual
Playgrounds / Parks / Athletic Fields
$38,636,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 30, 2024
June 1, 2028
415 S St Louis St, Los Angeles, CA
Related To This Project
Los Angeles, CA
--
RFQ Construction Manager at Risk - 5210 Pacific Concourse Drive Tenant Improvement Project - 5475208
Los Angeles, CA
Bid Date: Jan 15 2026
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Jul 24 2024
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
