BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Los Angeles, California. Conceptual plans call for site work for a playground / park / athletic field and water / sewer project.

The Hollenbeck Park Lake Rehabilitation Project is a proposed project led by the City of Los Angeles, Department of Public Works, LA Sanitation and Environment (LASAN) in partnership with the City of Los Angeles Recreation and Parks Department (RAP) to implement a regional multi-benefit stormwater project in Hollenbeck Park and the adjacent neighborhood. The goal is to improve water quality in the Boyle Heights neighborhood, Hollenbeck Park Lake (Lake), and the Upper Los Angeles River Watershed (ULAR). This project proposes multi-benefit components consisting of stormwater diversions, capture and treatment structures, and green street network components, the project will enhance the community. Proposed green street elements within the watershed will improve air quality and provide aesthetically appealing green spaces for residents to enjoy year-round. The addition of about 50 trees in the park and the surrounding area will provide shade, reduce heat island effect, and cool the area for pedestrians and people engaged in active recreation. Any stormwater capture structures such as drywells or subsurface storage units will be mostly unseen from the surface (aside from a few covered access holes). These structures will reduce flooding, especially during significant storm events. Constructed wetlands and recirculation will provide water quality and community benefits. Overall, these improvements will be a newer, fresher, and greener revitalization to this neighborhood, all without displacing any residents or businesses. Per the owner, as of November 22, 2024, this project is in the pre-design phase. Owner states that the contract to award a design team is still on-going. The owner states that construction is currently anticipated to begin in 2028.

Conceptual

Playgrounds / Parks / Athletic Fields

$38,636,000.00

Public - City

Site Work

182

14

10

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,241
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

June 1, 2028

img_map_placeholder

415 S St Louis St, Los Angeles, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.