BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Morgantown, West Virginia. Completed plans call for the renovation of a educational facility.

De-energize existing Westinghouse three-phase type DSL Transformer Substation, Class AA/FA transformer and provide a new "like-for-like" transformer to be located inside the HSC Chiller Plant. West Virginia University on behalf of its Board of Governors ("BOG") located in Morgantown, West Virginia ("WVU" or "University") is initiating this Request for Bids ("RFB") from qualified, experienced, and licensed Contractors to provide labor, materials, equipment, and services to de-energize existing Westinghouse three phase type DSL Transformer Substation, Class AA/FA transformer and provide a new "like-for-like" transformer to be located inside the Health Sciences Center ("HSC") Chiller Plant. Question Deadline: 07/23/2024 at 12:00 PM ET. Questions must be submitted directly electronically. Addenda will be posted electronically. The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated below. The date of issuance of the West Virginia University's Notice to Proceed and/or Contact shall be used to calculate Substantial and Final Completion. Substantial Completion shall be: Sixty (60) days after transformer arrives on site. Final Completion shall be: Thirty (30) days thereafter. Final Completion shall be when project site is de-mobilized and all project documents listed in Close-Out section of the specifications has been sent to the Owner. Liquidated Damages 1. The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated above. The date of issuance of the West Virginia University's Notice to Proceed or Executed Agreement shall be used to calculate Substantial and Final Completion of contract time stated in number of consecutive calendar days or established date. Time is of the essence. Liquidated Damages shall be Five Hundred Dollars ($500) per Calendar Day of delay in achieving Substantial Completion and Two Hundred and Fifty Dollars ($250) per Calendar Day of delay in achieving Final Completion.

Award

Educational

$324,500.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
110
Bidding Soon
1,356
All Active Projects
681
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 5, 2024

September 4, 2024

img_map_placeholder

64 Medical Center Dr, Morgantown, WV


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.