BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Taft, Oklahoma. Completed plans call for site work for a water / sewer project.

Arpa Water System Improvements - Provide and Install 113 Amr Meters and Meter Boxes Funding for This Project is Provided Through American Rescue Plan Act (Arpa) Grant Program. As Such, Compliance With Labor Standards Contract Provisions is Mandatory. Compliance With the Davis Bacon Act is Mandatory if the Total Project Cost Exceeds $10,000,000 (Ten Million Dollars). All Work Shall Be Performed, and All Construction and Materials Used and Furnished Shall Be in Accordance With the Plans and Specifications Prepared by Infrastructure Solutions Group, Llc, and on File in the Office of Town of Taft. Each Bidder Shall Accompany His Original Bid, Filed With the Town of Taft, With a Certified or Cashier's Check on a Solvent Bank Located in Oklahoma, or a Bidder's Bond, in the Amount of Five (5) Percent of the Amount Bid, as a Guarantee of His Ability to Perform the Contract Bid Upon, and That He Will Enter Into a Written Contract With the Owner to Perform Said Work and/or Furnish Said Materials in Accordance With Said Plans and Specifications, and Furnish the Required Bonds According to the Public Competitive Bidding Act of 1974. The Owner Will Retain the Deposit for Liquidated Damages in Case the Successful Bidder Fails to Enter in Said Contract and Furnish the Required Bonds Provided for in the Specifications Within the Time Required. Deposit of the Unsuccessful Bidders Will Be Returned Upon the Execution of the Contract and Required Bonds. Construction, Maintenance and Statutory Payment Bonds in the Amount of 100% of the Contract Price Are Required for This Project. The Following Requirements and Regulations Must Be Complied With: a. "Equal Opportunity in Employment: All Qualified Applicants Will Receive Consideration for Employment Without Regard to Race, Color, Religion, Sex, National Origin, Age or Physical Handicap. The Department of Labor Provides All Pertinent Information Related to Compliance With Labor Standards, Including Prevailing Wage Rates and Instructions for Reporting. More Information is Available at online Bids Received More Than Ninety-six (96) Hours Prior to the Bid Opening Will Be Returned. The Contract is to Be Awarded to the Lowest, Responsive, Responsible Bidder. The Owner Reserves the Right to Correct Any Non-material Clerical Errors in the Bidding as Allowed Under Oklahoma Law. The Owner Reserves the Right to Reject Any and All Bids in Accordance With the Oklahoma Public Competitive Bidding Act of 1974. Conditional Bids Shall Not Be Accepted.

Bid Results

Water / Sewer

$76,100.00

Public - City

Site Work

7

12

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
92
Bidding Soon
1,050
All Active Projects
526
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 1, 2024

September 4, 2024

October 4, 2024

img_map_placeholder

Multiple Locations, Taft, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.