Demolition, site work and paving for a mixed-use development in Tahlequah, Oklahoma. Completed plans call for the demolition of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; warehouse / distribution facility; warehouse / distribution facility; and warehouse / distribution facility.

NSU Warehouse Fence. Question Deadline 07/29/2024 All questions shall be furnished in writing to: Northeastern State University Attention: Purchasing Dept. 600 North Grand Avenue Tahlequah, OK 74464 Any RFIs must be submitted in writing 72 hours prior to the bid opening. Estimated Project Cost: $84,000.00 Description: Work Summaries The following Contract (Bid Group) Work Summaries describe the intended scope of work to be included in the Bid Package. The bid shall include all the requirements of the plans with specifications unless specifically indicated otherwise in this summary. This includes all layout and daily clean up involved with the work. It is the bidder's responsibility to review bidding requirements and forms to insure a complete, safe, and coordinated execution of the Work Package being quoted. Additionally, bidders shall include in their pricing applicable portions of related specification sections normally associated with the work to be done whether specifically indicated by this Contract Work Summary or not. Should any bidder be unclear as to the scope of work required, he is instructed to contact the Owner for resolution prior to bidding. In the absence of written instruction to the contrary, in matters of specification and/or scope of interpretation, bidders shall include the more costly and complete of the possible interpretations. Awarding of Contracts will be based on the best qualified bid. CONTRACT: General Construction Work including but not limited to the following: 1) Drawings and Specifications as identified in Contract Attachment "B" Including But Not Limited To: 1) NSU is a "Tobacco Free" campus; Contractor will be expected to abide by NSU policy and will be held accountable for all Subcontractors on site. 2) Contractor shall be responsible for coordination of all necessary local, state and federal, pre, during and post compliance inspections. Contractor shall provide NSU with documentation of compliance at completion of work. 3) Contractor to be responsible for all permits and fees associated with this scope of work. 4) Work may be halted and resumed at any given time according to NSU's needs. 5) Contractor shall be responsible for mobilization and staging locations to minimize daily operations of the university. 6) Utility terminations shall be in accordance with the governing utility procedures and regulations. NSU will be given a minimum of 24 hours' notice prior to any utility outages/shut-offs. 7) Contractor shall be responsible for coordinating and maintaining any and all utility locations/markings for the project. 8) Contractor is responsible for furnishing, receiving, protecting and installing specified materials per the construction documents. 9) Contractor is responsible for all field verifications of dimensions and conditions. 10) Contractor is to ensure that construction trash and demolished debris is gathered and disposed of daily in a contractor provided trash receptacle. 11) Contractor is responsible for daily clean-up and equipment storage. NSU is not responsible for damaged or stolen property and/or equipment. 12) Contractor shall be responsible for abiding OSHA and NSU safety regulations. 13) Contractor shall be responsible for protection of existing equipment and materials that are not called out to be demolished or repaired. 14) Any discrepancy between the plans/specifications and actual field conditions must be submitted in writing to the owner a minimum of 48 hours prior to the bid closing date. 15) Contractor shall be responsible for any broken or crushed concrete sidewalks, curbs, decks, walls or other cementitious materials. 16) Contractor shall be responsible for any rutted or furrowed green space resulting from this scope of work. 17) Contractor shall repair any damaged playing surface to original conditions. 18) Contractor shall not interfere with building exits or egress paths of any occupied buildings. 19) Contractor shall maintain a site supervisor at all times when the contractor has a presence on campus. 20) Contractor shall be responsible for Final Cleaning. This will be to the Owner's discretion 21) Final Lay-out shall be approved by the Owner prior to excavation or drilling. 21) All underground utilities shall be sand bedded as shown in construction documents. 22) Contractor shall provide over watch for wet concrete to avoid graffiti or defacing of the concrete surface. 23) Contractor shall supply portable restroom facilities for all sub-contractors on site. 24) Contractor shall clean and/or remove "track out" created by construction vehicles or equipment on NSU or City streets/sidewalks, daily. 25) Contractor to coordinate parking, staging area with owner prior to mobilization. 26) Contractor to notify owner of traffic disruptions on city or university streets, 24 hours in advance. 27) Trees designated for removal shall be approved by the owner before demolition. 28) Owner and Contractor to agree upon staging area prior to mobilization. 29) The Contractor shall remove and dispose of all existing fence within the scope of work. Site Address: corner of Crafton and Oklahoma Ave. Tahl. Site Directions: the Tahlequah campus at the Maintenance Warehouse located at the corner of Crafton and Oklahoma Ave. Tahlequah, Ok. 74464. All late bids will be unopened and becomes property of Northeastern State University. It is the responsibility of the bidder to make sure their bid is received by the bid due date and time. Northeastern State University reserves the right to reject any or all bids or to waive any formalities or irregularities in any bid, and to accept the bid or bids which seem most advantageous to the Owner.

Award

Warehouse / Distribution

$91,022.00

Public - State/Provincial

Demolition, Paving, Site Work

3

4

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
56
Bidding Soon
784
All Active Projects
339
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 2, 2024

img_map_placeholder

Crafton St & Oklahoma Ave, Tahlequah, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.