BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2024 at 8:00 PM

Updated August 2, 2024

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Chavez Branch - Locker Replacement Remove existing lockers and accessories and dispose of them off site. Supply, deliver, and install new all-welded two tiered Penco lockers including all necessary accessories for a professional installation. Lockers to meet CPS specifications for Elementary School lockers. Total of 227 lockers on three floors. Contractor to provide 5% ADA compliant.

Bid Results

Educational

$76,667.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
260
Bidding Soon
3,383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2024

September 23, 2024

Project location map

4831 S Hermitage Ave, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.