Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 31, 2024 at 8:00 PM
Updated August 1, 2024
Site work and paving for a mixed-use development in Berkeley, Illinois. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Berkeley Park - Bike Path and Baseball Field Improvements. Description: Remove railroad ties, fencing and infield mix near existing baseball field backstop. Remove combination curb and gutter along Electric Avenue, and concrete sidewalk at various locations throughout the site. Re-install chain link fabric on 6' fence, install new backstop fencing with roof structures installed over the dugouts, and install new infield mix within updated baseball field limits. 8' wide asphalt path to be installed traversing through the site. Concrete sidewalk to be installed in multiple locations throughout the site. To meet grading constraints, 6" barrier curb is required along path at certain locations as depicted on the plans. All disturbed areas to be restored in-kind to pre-existing project conditions. Alternate is to install multi-flow underdrains in left field of baseball field and tie them into structure adjacent to left field.
Bid Results
Playgrounds / Parks / Athletic Fields
$290,500.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2024
August 29, 2024
6500 Electric Ave, Berkeley, IL
Related To This Project
Berkeley, IL
Bid Date: Aug 01 2024
Berkeley, IL
Bid Date: Nov 08 2024
Berkeley, IL
Bid Date: Nov 12 2024
Berkeley, IL
Bid Date: Apr 30 2025
Berkeley, IL
Bid Date: Apr 30 2025
Berkeley, IL
Bid Date: Jun 30 2025
Berkeley, IL
Bid Date: Sep 18 2025
Berkeley, IL
Bid Date: Dec 11 2023
Berkeley, IL
Bid Date: Sep 09 2022
Berkeley, IL
Bid Date: Sep 22 2023
Berkeley, IL
Bid Date: Mar 09 2022
Berkeley, IL
Bid Date: Jan 14 2022
Berkeley, IL
Bid Date: Jan 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
