BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Murrieta, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Rehabilitation of Murrieta Hot Springs Road from Whitewood Road to Margarita Road (approximately 3/4 of a mile in length) includes removal and replacement of pavement failure sections, full width roadway grinding of existing asphalt, placement of asphalt rubber hot mix (ARHM) overlay, detector loop replacement, signing/striping, surveying, miscellaneous concrete removal and replacement, full structural section removal and replacement adjacent to the Warm Springs Creek bridge, and PCC removal and replacement for curb ramps, curb/gutter, spandrel, and cross gutter at the intersection of Weeping Willow Lane and Thoroughbred Lane as shown on the plans, these special provisions/specifications, or as directed by the City Engineer. The Engineer's Estimate for this project is $1,800,000.00. Project Duration 30 Working Days Question Deadline 07/25/2024 at 3:00 PM PT For questions regarding the purchase of Plans, Specifications, and Contract Documents please call: (951) 461-6070. For all other questions, please contact Garrett Strang, Project Manager at (951) 461-6085 or at gstrang@murrietaca.gov The contractor shall be licensed in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code. The classification of Contractor's license required in the performance of this Contract is Class A or Class C-12. Each bidder musts can and submit the following documents with its electronic bid prior to the bid date and time listed above: Proposal, Bid Bond at Ten Percent (10%) of the Base Bid, Executed Contract, and the documents listed in the Instructions to Bidders. The bidder can utilize a cashier's check in lieu of a bid bond in the amount of ten percent (10%) of the base bid. If a cashier's check is used, its hall be delivered to the City Clerk in a sealed envelope at 1 Town Square, Murrieta, CA 92562 prior to the bid date and time listed above. The successful bidder shall be required to furnish labor and material bonds and faithful performance bonds to the City of Murrieta in the amount of one hundred percent (100%) of the amount of the Contract. The City Council reserves the right to reject any or all bids, to delete portions of the work, or to waive any defect or informality in any bid received. SCOPE OF WORK The scope of work will consist of rehabilitation of Murrieta Hot Springs Road from Whitewood Road to Margarita Road. Additional work includes but is not limited to: removal and replacement of pavement failure sections, grinding of existing asphalt, placement of asphalt rubber hot mix (ARHM) overlay, detector loops, signing/striping, surveying, miscellaneous concrete removal and replacement, full structural section removal and replacement adjacent to the Warm Springs Creek bridge, traffic control, and PCC removal and replacement for curb ramps, curb/gutter, spandrel, and cross gutter at the intersection of Weeping Willow Lane and Thoroughbred Lane as shown on the plans, these special provisions/specifications, or as directed by the City Engineer. All material and equipment shall be delivered by Contractor to the site, or to the City yard if removal and salvage is specified on plans. Contractor shall coordinate with utility companies and allow for construction time for utility relocation by utility agency, at no additional cost to the City. LOCATION OF WORK The project is located on Murrieta Hot Springs Road from Whitewood Road to Margarita Road (approximately 3 by 4 of a mile); and the intersection of Weeping Willow Lane and Thoroughbred Lane (4 curb ramps located at this intersection) TIME OF COMPLETION Contractor shall complete all work in every detail within the time limits specified in the Instructions to Bidders, Section 18, herein.

Award

Roads / Highways

$1,991,000.00

Public - City

Paving, Site Work

8

11

6

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
548
Active Projects
241
Bidding Soon
3,893
All Active Projects
1,812
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 1, 2024

September 30, 2024

img_map_placeholder

Murrieta Hot Springs Rd, Murrieta, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.