BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work, renovation and addition to a detention facility in Prince Albert, Saskatchewan. Working plans call for the addition of a 5,831-square-foot, one-story above grade detention facility; and for the renovation of a detention facility.

Admitting Area Upgrade at the Pine Grove Correctional Centre, Prince Albert, Saskatchewan. An addition is required to the west side of the main cell block building. The proposed admitting area footprint is expected to be 500 m2. TIMELINE: Construction was planned for 2025 however, project schedules may have been revised. An update may be available by late 2025/2026, pending owner's decision to proceed.

Final Planning

Jails / Prisons

$3,500,000.00

Public - State/Provincial

Addition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
53
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2026

Project location map

1700 7 Ave NW, Prince Albert, SK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.