BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work and paving for a road / highway in Sunapee, New Hampshire. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project involves the reconstruction of a section of NH 11 in Sunapee damaged by a significant rainfall event that occurred July 9-17, 2023. The project begins approximately 1200-ft east of Trow Hill Road and proceeds easterly for approximately 1600-ft. Reconstruction of this section of roadway will include removal and replacement of unsuitable material in the failure area along with the installation of reinforcing/stabilization piles along the slope to provide stability. Additional work includes installation of underdrain, guardrail, settlement platforms, and surcharge fill material. County: Sullivan Scope of Work : Reconstruction of the roadway damaged by slope failure due to heavy rain event Proposal Guarantee: 5% of bid amount This Project Involves Reconstruction of a Section of Nh 11 in Sunapee Damaged by a Significant Rainfall Event. Question Deadline 06/19/2025 - Bidders Should Act Promptly and Submit All Questions Pertaining to the Project in Writing to Corey Spetelunas at Corey.R.Spetelunas@dot.nh.gov at Least Five (5) Business Days Before the Hour and Date Set for the Bid Opening. No Phone Calls or Faxes Will Be Accepted. Completion date : 10/30/2026 All individuals, firms, partnerships or corporations intending to bid, before obtaining plans and specifications, must file with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids, a statement showing their qualifications. No valid bidding proposal will be issued to a prospective bidder who is not qualified. If contract price is $35,000 or more, the successful bidder will be required to furnish electronically, at the time of approval, a contract bond in the amount of one hundred (100) percent of their bid. The right is reserved to waive any informalities in or to reject any or all proposals. NH DOT - Reconstruction of the Roadway Damaged by Slope Failure Due to Heavy Rain Event - NH 11

Award

Roads / Highways

$2,863,446.00

Public - State/Provincial

Paving, Site Work

13

8

6

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
322
Active Projects
128
Bidding Soon
2,605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.