Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Herrin, Illinois. Completed plans call for site work for a water / sewer project.
As of August 23, 2024, this project has not yet been awarded. A timeline for award has not yet been established. East Secondary Clarifier Painting Owner: City of Herrin Location: Herrin Wastewater Treatment Plant, 1221 Weaver Road, Herrin, IL 62948 Proposed Improvements: This project consists of all labor, equipment, and materials necessary to complete surface preparation and painting of the existing designated secondary clarifier, and related miscellaneous work. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). This contract calls for the construction of a "public work," within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. ("the Act"). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the current "prevailing rate of wages" (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Department publishes the prevailing wage rates on its website at http://Iabor.illinois.gov/. The Department revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the Department's website for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage requirements and notice and record keeping duties. Instructions to Bidders . Bid Form / Schedule of Prices . Bid Bond Submission of a Bid shall be conclusive assurance and warranty the Bidder has examined the Plans/Bid Documents and understands all requirements for the performance of Work. The Bidder will be responsible for all errors in the Bid Documents resulting from failure or neglect to conduct an in-depth examination. The Owner will, in no case be responsible for any cost, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the Bidder. The Bidder shall take no advantage of any error or omission in the Bid Documents. The Bid shall be placed in a sealed envelope and shall be marked to clearly indicate its contents. When sent by mail, the sealed Bid Documents shall be addressed to the Owner at the address and in care of the official in whose office the Bids are to be received. All Bid Documents shall be filed prior to the time and at the place specified in the Advertisement of Bid. Bid Documents received after the time specified will be returned to the Bidder unopened. Permission will be given to a Bidder to withdraw a Bid if the Bidder makes the request in writing or in person before the time for opening proposals. The Work will be substantially complete and will be completed and ready for final payment in accordance with the Special Provisions; all Work shall be fully functional and substantially complete within 90 Calendar Days of the execution of this Agreement; all Work shall be complete and ready for final payment within 30 Calendars Days of after fully functional and substantially complete. Substantial Completion shall be the functional operation of the secondary clarifier. Final Completion shall be when cleanup and punch list items have been completed.
Award
Water / Sewer
$59,860.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 8, 2024
September 9, 2024
1221 Weaver Rd, Herrin, IL
Related To This Project
Herrin, IL
Bid Date: Aug 02 2024
Herrin, IL
Bid Date: Aug 02 2024
Herrin, IL
Bid Date: Jun 11 2024
Herrin, IL
Bid Date: May 15 2024
Herrin, IL
Bid Date: Apr 22 2024
Herrin, IL
Bid Date: Apr 09 2024
Herrin, IL
Bid Date: Mar 13 2024
Herrin, IL
Bid Date: Feb 16 2024
Herrin, IL
Bid Date: Jan 19 2024
Herrin, IL
Bid Date: Aug 18 2022
Herrin, IL
Bid Date: Mar 23 2022
Herrin, IL
Bid Date: Aug 31 2023
Herrin, IL
Bid Date: Aug 31 2023
Herrin, IL
Bid Date: Aug 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.