Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 16, 2024 at 8:00 PM
Updated August 17, 2024
Renovation of a water / sewer project in Fond du Lac, Wisconsin. Completed plans call for the renovation of a water / sewer project.
SCOPE OF WORK Materials, Equipment, and Labor for the installation of a Fluid Engineering Series 751 Hyper-Jet Self Cleaning Strainer Question Deadline 07/25/2024 at 12:00 PM CT Inquiries regarding this Request for Bids will be accepted via E-mail only, addressed to Cameron Fails, at cfails@fdl.wi.gov. Unauthorized contact regarding the RFB with other City of Fond du Lac employees may result in disqualification. Scope Bidders should familiarize themselves with the attached specifications. Reference to Fluid Engineering equipment is for reference only, and any OR EQUAL bids will be considered The City also reserves the right to waive any formalities or informalities in bidding, and to select the bid that, in its opinion, will best serve the interests of the City. Automatic Strainer Installation Labor, Equipment, and Materials to perform the following: -Install mounts for new strainer and any additional concrete work -Modify existing piping to accommodate the new strainer with 8" 304 SS piping and fittings -Install backwash piping to existing drain with sch 40 PVC piping -Includes new SS hardware, Dezurik valves and gaskets -Excludes electrical installation of the control panel and wiring of electric motor and control valves -Manual strainer to remain in place New Automatic Strainer FLUID ENGINEERING SERIES 751 HYPER-JET(R) SELF-CLEANING STRAINER HOUSING MATERIAL: A126 GRADE B CAST IRON BACKWASH ASSY: STAINLESS STEEL O-RING MATERIAL: BUNA-N COATING/LINING: RED-OXIDE PRIMERED EXTERIOR INLET/OUTLET CONN: 8"-125# FF FLANGED BACKWASH CONN: 1-1/2" NPT EXTERNAL SOURCE CONN: 1" NPT DRAIN CONN: 1" NPT VENT CONN: 1/4" NPT INST CONN (2): 1/4" NPT DESIGN; 150 PSIG@150F SCREEN ASSEMBLY FOR SELF-CLEANING STRAINER FITS 8'710" SERIES 700 FLUID ENGINEERING STRAINER 0.007" (175 MICRON) SLOTTED REVERSE-ROLLED WEDGE-WIRE CONSTRUCTION316LSTAINLESS STEEL 1/4 HP ELECTRIC MOTOR 115/208-230 VOLT 1PH 60HZ TEFC ENCLOSURE CLASS B INSULATION CONTROL PANEL WORKS WITH FLUID ENGINEERING HYPER-JET(R) SELF-CLEANING STRAINER ELECTRICAL REQUIREMENTS: 120 VOLT SINGLE PHASE 60HZ NEMA 4X STAINLESS STEEL ENCLOSURE RESET BUTTON ON DOOR FOR MOTOR OVERLOAD FUSIBLE MAIN DISCONNECT SWITCH WITH J TYPE FUSE SQUARE D GK6 TERMINAL BLOCKS AB MOTOR STARTER AND SOLID STATE OVERLOAD RELAY STANDARD TIMER LOGIC 30MM TYPE DOOR OPERATORS 1-1/2" BALL VALVE WITH ELECTRIC ACTUATOR 1" BALL VALVE WITH ELECTRIC ACTUATOR DIFFERENTIAL PRESSURE SWITCH
Post-Bid
Water / Sewer
$285,781.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2024
August 30, 2024
700 Doty St, Fond du Lac, WI
Related To This Project
Fond du Lac, WI
Bid Date: Sep 05 2024
Fond du Lac, WI
Bid Date: Sep 06 2024
Fond du Lac, WI
Bid Date: Aug 21 2024
Fond du Lac, WI
Bid Date: Sep 11 2024
Fond du Lac, WI
Bid Date: Sep 19 2024
Fond du Lac, WI
--
Fond du Lac, WI
Bid Date: Nov 13 2024
Fond du Lac, WI
Bid Date: May 29 2025
Fond du Lac, WI
Bid Date: Aug 13 2024
Fond du Lac, WI
Bid Date: Jan 13 2026
Fond du Lac, WI
--
Fond du Lac, WI
--
Fond du Lac, WI
--
Fond du Lac, WI
Bid Date: Dec 01 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
