BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a playground / park / athletic field in Fenton, Missouri. Completed plans call for the renovation of a playground / park / athletic field.

2024 Fabick Nature Preserve Bathroom Restoration Question Deadline 08/15/2024 In a case of doubt as to the true meaning of any part of the Plans and Technical Specifications, or any other of the Bid Documents, any person who has obtained a copy of the Bid Documents may submit to the City an e-mail request to dhoward@fentonmo.org for an interpretation thereof no later than seven (7) days before the date set for receipt of bids. Questions or requests for interpretation submitted via phone or voicemail will not be answered Contractor shall furnish all labor, equipment, materials, permits, etc. necessary to restore an existing bathroom building located in the Fabick Nature Preserve at 597 New Smizer Mill Road, Fenton, MO 63026, and as fully described with the Plans & Specifications Section herein, all in accordance with the terms and specifications herein Bids should be clearly marked BID OPENING: 2024 FABICK NATURE PRESERVE BATHROOM - ATTN: DIRECTOR OF PUBLIC WORKS. Bids shall be submitted on the Bid Proposal form provided. It is not anticipated that the cost of this Project is $75,000 or more to where prevailing wage would apply. However, if applicable, the successful bidder shall comply with State provisions concerning the payment of prevailing wages on public works projects. If applicable, Wage Order No. 31 would apply to this Project and is incorporated herein by reference. The successful bidder shall require all on-site employees to complete a ten-hour Occupational Safety and Health Administration (OSHA) construction safety program provided by the contractor which includes a course in construction safety and health approved by OSHA or a similar program approved by the Department of Labor and Industrial Relations of the State of Missouri which is at least as stringent as an approved OSHA program, as required under Subsection 292.675.2 RSMo. All employees are required to complete the program within sixty days of beginning work under this contract. The successful bidder shall also require all subcontractors under the contractor to provide the ten-hour training program required under Subsection 292.675.2 RSMo. to such subcontractors' on-site employees.

Bid Results

Playgrounds / Parks / Athletic Fields

$25,470.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
54
Bidding Soon
791
All Active Projects
288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 2, 2024

img_map_placeholder

597 New Smizer Mill Rd, Fenton, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.