Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Gilroy, California. Completed plans call for the renovation of a 7,008-square-foot, one-story above grade educational facility.
The Administration Building at the District’s Gilroy Campus has an inadequate HVAC system that needs to be replaced. Heating is currently being supplied by heating boilers at the Math Building’s central boiler plant. Cooling is currently supplied by condensing units serving interior mounted AHUs. The building is approximately 2,500 square feet. The scope of services includes removing existing HVAC in the Administrative Building and replacing with new ceiling mounted units. Removing existing window AC units and replace with new window pane to match existing window. Bid Valid Liquidated Damages $1,000/Day Estimated Bid Value 400000 Start/Delivery Date Anticipated November 18, 2024 Project Duration 90 Days Bid Bond Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting: Yes - Mandatory Pre-Bid Meeting: Date 10/08/2024 12:30 PM (PDT) Pre-Bid Meeting: Gavilan College - Security Building 5055 Santa Teresa Blvd, Gilroy, CA Online Q&A : Yes Q&A Deadline : 10/11/2024 4:00 PM (PDT) Project Type: Bid Response Types : Line Items Subcontractor Bid Bond NonCollusion Declaration (required) Sufficient Funds Declaration (required) Workers' Compensation Certificate (required) Drug-Free Workplace Certification (required) Iran Contracting Act Certification (required) Bid Form (required) General Attachment (anything else you want to add that is not required) Type of Award : Lump Sum Categories: 236220 - Commercial and Institutional Building Construction 238220 - Plumbing, Heating, and Air-Conditioning Contractors 238290 - Other Building Equipment Contractors SCOPE OF WORK: The following information should be used as the basis for the bid. 1. Project Description: The Administration Building at the District's Gilroy Campus has an inadequate HVAC system that needs to be replaced. Heating is currently being supplied by heating boilers at the Math Building's central boiler plant. Cooling is currently supplied by condensing units serving interior mounted AHUs. The building is approximately 2,500 square feet. See Exhibit A for floor plan and Exhibit B for building location. 2. Project Scope: Remove existing HVAC in the Administrative Building. Replace with new ceiling mounted units. Remove existing window AC units, replace with new window pane to match existing window. 3. Finney Architects has completed a set of DSA approved Construction Drawings and Specifications for this project. 4. The college will provide the following equipment to be installed by the contractor. a. Daikin VRV BOM (Exhibit C) b. Greenheck ERV (Exhibit D) 5. The contractor shall be responsible for the replacement of the HVAC system as outlined in the provided construction drawings and specifications. Contractor shall also be responsible for disposing of old equipment in the College's metal recycling.
Bid Results
Educational
$462,900.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2024
November 19, 2024
5055 Santa Teresa Blvd, Gilroy, CA
Related To This Project
Gilroy, CA
Bid Date: Aug 09 2024
Gilroy, CA
Bid Date: Oct 17 2024
Gilroy, CA
Bid Date: Sep 05 2024
Gilroy, CA
Bid Date: Oct 01 2024
Gilroy, CA
Bid Date: Oct 01 2024
Gilroy, CA
Bid Date: Oct 17 2024
Gilroy, CA
Bid Date: Oct 11 2024
Gilroy, CA
Bid Date: Jul 19 2024
Gilroy, CA
--
Gilroy, CA
Bid Date: Aug 16 2024
Gilroy, CA
Bid Date: Jun 27 2024
Gilroy, CA
Bid Date: Jun 19 2024
Gilroy, CA
Bid Date: Jun 17 2024
Gilroy, CA
Bid Date: Jun 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.