BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Platina, California. Completed plans call for the renovation of a military facility.

Furnish and Install Drinking Water Fountain with a Bottle Filling Station with Single ADA Cooler Filtered Non-Refrigerated. See attached Solicitation 127EAY24Q0068 for requirements and specifications. The location is at Harrison Gulch Work Center in Platina, CA 96076 on Hwy 36 West of Red Bluff, CA. The Harrison Gulch Work Center Engine Bay has a location ready for hook-up for a drinking water fountain. The original plans stubbed out a supply line, drain line, and electrical outlet, but a fountain was never installed. The contractor shall Furnish & Install a Bottle Filling Station with Single ADA Cooler Filtered Non-Refrigerated Drinking Fountain including all materials necessary for proper installation, removal and replacement of drywall, and replacement of the existing outlet to a GFCI outlet. -- Furnish & Install Drinking Water Fountain with a Bottle Filling Station with Single ADA Cooler Filtered Non-Refrigerated Questions Contact Margaret Forrest 50-233-8756 QUOTES Due 07/25/2024 Email quotes to margaret.forrestusda.gov Address questions no later than 07/15/2024 4:30 pm PT about this solicitation to Margaret Forrest at margaret.forrestusda.gov Work shall be performed in such a matter to meet the performance requirements stated herein. . Furnish & Install a filtered drinking water fountain with water bottle filling station . Furnish & Install all necessary materials to properly connect to existing water supply and drain pipe . Rearrange existing water and wastewater plumbing for all new plumbing to fit underneath the cabinet . Furnish & Install carrier support for the unit . Replace an outlet with a GFCI outlet . Remove, Dispose, & Repair/Replace any drywall necessary for proper installation of equipment . Coordinate with Forest Service staff to shut off water for equipment installation . Flush the existing water line once the cap has been removed into a proper container to clear any stagnant water and debris that could have accumulated over time. . The Contractor is responsible for all notifications, fees, licenses, training, permits, etc. required to perform the work in accordance with applicable Federal and State statutes and regulations, and for subsequent fines or other penalties resultant from their failure to conform to the requirements. The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local laws, rules, and regulations pertaining to Work practices, protection of Workers, authorized visitors to the site, persons, and property adj

Post-Bid

Military

$20,000.00

Public - Federal

Renovation

3

7

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
9
Bidding Soon
197
All Active Projects
96
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 25, 2024

August 26, 2024

img_map_placeholder

2555 CA-36, Platina, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.