Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and addition to a fitness / recreation center in Lake Crystal, Minnesota. Completed plans call for the addition of a 2,200-square-foot, two-story above grade fitness / recreation center; for the demolition of a fitness / recreation center; and for site work for a fitness / recreation center.
The City of Lake Crystal, in cooperation with the Lake Crystal Recreation Center The City of Lake Crystal is working with Widseth Architects and Engineers to design a two story, 2,200sf expansion to the existing recreation center. A referendum is not required; however, the project must be approved by the City Council and Mayor Todd Wiens. The City of Lake Crystal is requesting proposals from qualified interested firms to provide Construction Management at Risk (CMaR) services in cooperation with the City of Lake Crystal and Widseth Architects and Engineers to for the following project. This Request for Qualifications (RFQ) has been prepared in accordance with Statute 471.463 and acts as both Request for Qualifications and Request for Proposals. Pre-Qualification: Yes Proposals shall include the following: A. Professional Organization: 1. Brief firm history. 2. Location of home office and branch offices. Location of office that from which this project will be administrated. 3. Qualifications and Experience of the Firm: List and briefly describe relevant construction management projects completed including size, components, and other pertinent information. Include contact information for the project Owner and Architect. 4. Total number of employees including contact information for the person authorized to negotiate on behalf of the respondent. 5. Financial standing 6. Bonding capacity 7. Potential conflicts of interest 8. Corporate safety program and safety record B. Project Team: List proposed key team members for this project including project manager and job superintendent, indicating their responsibilities, relevant experience, and other qualifications. C. Construction Management Approach - Briefly describe proposed administration of this project, including: 1. Cost estimating 2. Relationship to the Architect in preparation of the project manual 3. Value engineering 4. Bidding administration 5. Project scheduling 6. On-site project coordination 7. Cost control during construction 8. Change order procedures 9. Safety program 10. Management and coordination of final start-up, testing, and occupancy D. List of References 1. Provide a list three public client references for which the firm has provided Construction Management services. Questions concerning the RFQ may be directed to: Angie Grafstrom 507-726-2538 ext: 5 cityadmin@lakecrystalmn.org The Owner shall not be liable for any expenses incurred by the respondent in preparing the RFQ response or making presentation in its regard. Maximum page count: 20 a. Excluding the following: i. Front and back cover sheets ii. Appendix sheets Location Details City: Lake Crystal County: Blue Earth State/Province: MN
Award
Fitness / Rec Centers
$112,000.00
Public - City
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2024
April 1, 2025
621 W Nathan St, Lake Crystal, MN
Related To This Project
Lake Crystal, MN
Bid Date: Dec 06 2024
Lake Crystal, MN
Bid Date: Jul 08 2024
Lake Crystal, MN
Bid Date: May 13 2021
Lake Crystal, MN
Bid Date: Nov 01 2023
Lake Crystal, MN
Bid Date: Feb 26 2019
Lake Crystal, MN
--
Minneapolis, MN
--
Minneapolis, MN
--
Saint Peter, MN
--
Minneapolis, MN
--
Kasson, MN
Bid Date: Aug 06 2024
Minneapolis, MN
Bid Date: Jul 25 2024
Ramsey, MN
Bid Date: Aug 05 2024
Perham, MN
Bid Date: Aug 09 2024
Parkers Prairie, MN
Bid Date: Aug 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.