BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2026 at 7:00 PM

Updated January 29, 2026

Site work for a civil project in Lake Crystal, Minnesota. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

Approximately 11.2 acres of topsoil stripping and spoil placement and 60,600 cubic yards of excavation material for the construction of a 4-acre storage basin with a concrete low flow weir structure, seeding, and erosion control. Includes approximately 1,600 linear feet of 15 inch agricultural tile. All contractors and subcontractors must pay all laborers and mechanics the established prevailing wages for work performed under the contract.

GC Bidding

Bridges / Tunnels

$428,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
135
Bidding Soon
1,334
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

March 20, 2026

Project location map

To Be Determined, Lake Crystal, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.