EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a library in Hershey, Pennsylvania. Completed plans call for the renovation of a library.

HVAC Unit Replacement at Hershey Public Library Each Bid Must Be Accompanied by Bid Security in the Form of a Certified Check, Cashier's Check, or Bid Bond of a Surety Company Legally Authorized to Do Business in the Commonwealth of Pennsylvania, in an Amount Equal to Ten (10%) of the Bid. All Bids Must Be Submitted Using the Bid Forms Provided Within the Bid Documents and Must Be Accompanied by All Documents and/or Forms Provided for Within the Bid Documents. No Bidder May Withdraw His Bid for a Period of Sixty (60) Days After the Date of the Actual Opening of Bids. The Successful Bidder Will Be Required to Furnish and Pay for Satisfactory Performance and Payment Bonds in an Amount Equal to One Hundred Percent (100%) of the Contract Price Within Ten (10) Days After the Contract Has Been Awarded and May Also Be Required to Furnish a Contractor's Qualification Statement. The Township of Derry Reserves the Right to Reject Any or All Bids, and to Accept or Reject Any Parts Thereof, or Items Therein, and to Waive Any Defects or Irregularities in Bids and Bid Securities, and to Make the Award That is Determined to Be in the Best Interest of the Township. No Bid May Be Considered From Any Person, Firm or Corporation Who Has Defaulted in the Performance of Any Contract or Agreement Previously Made With the Township or Conclusively Shown to Have Failed to Perform Satisfactorily Such Contract or Agreement With the Township. Bid documents must be acquired through Moore Engineering to be qualified for bidding. Question Deadline 08/07/2024 All questions about the meaning or intent of the Contract Documents are to be directed to Engineer.

Post-Bid

Library

$787,000.00

Public - City

Renovation

5

10

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Warranties, Commissioning
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Flexible Connectors
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
116
Bidding Soon
1,747
All Active Projects
819
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2024

September 11, 2024

img_map_placeholder

701 Cocoa Ave, Hershey, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

HVAC Unit Replacement at Hershey Public Library

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.