BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Torrington, Connecticut. Completed plans call for site work for a bridge / tunnel.

State Project Number(s) & Description: State Project No. 0065-0114; Metallizing of Various Bridges Along Route 8 Corridor Between Torrington and Colebrook in the Towns of Torrington, Winchester and Colebrook. Required Prequalification Work Classification(s): 11 - Bridge Painting. Federal-aid Project Number(s) & Funding Source: Federal FHWA (F.A.P. No. 0008(148)) and State Scope Code: J - $ 15,000,000 $ 19,999,999 Pre-Bid Conference and/or Site Visit Information: N/A District Number(s): 4 - Thomaston Contract DBE % Goal or SBE % Set-Aside: 2% DBE Prospective bidders must be prequalified with the Department of Transportation and have on file a sworn Statement (CON 16) by the time of the bid. In order to help ensure that prospective bidders may become prequalified in time for the bid opening for a given contract, contractors should be certain to return the Prequalification Application (CON 16) with all necessary information, signatures and notarized documents, to the DOT Contracts Unit at least thirty (30) calendar days before requesting a bid proposal form for that contract. Except when otherwise specified in the bid documents, no proposal will be considered unless; (a) it is accompanied by a proposal guaranty from a surety company in the form of the Department's (CTDOT) standard bid bond form furnished by the Department, as may be revised, satisfactory to the Commissioner, in an amount equal to at least 30% of the amount of the bid Questions Pertaining to Dot Advertised Construction Projects Must Be Presented Through the Ctdot Pre-bid Q and a Website. The Department Cannot Guarantee That All Questions Will Be Answered Prior to the Bid Date. Please Note - at 9:00 Am Monday (I.e. Typical Wednesday Bid Opening) the Project(S) Being Bid Will Be Closed for Questions, at Which Time Questions Can No Longer Be Submitted Through the Q and a Website. CTDOT - Metallizing of Various Bridges Along Route 8 Corridor - Torrington to Colebrook *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$15,757,497.00

Public - State/Provincial

Site Work

1832

14

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
137
Bidding Soon
3,657
All Active Projects
1,424
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

December 23, 2024

img_map_placeholder

CT-8, Torrington, CT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.