Published August 16, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Falconer, New York. Completed plans call for site work for a water / sewer project.

Reference Number: 0000357664 vendor to perform the West Side Sewer Extension Phase 2 Project. Question Deadline 08/09/2024 at 2:00 PM ET, Questions are submitted online : No . Chautauqua County reserves the right to accept or reject any and all bids, to waive any inconsistencies in, or to accept the bid deemed most advantageous to the County.1. Item 1 - Mobilization/Demobilization Under this Item, the CONTRACTOR shall provide all labor, materials, tools, and equipment necessary and required to perform mobilization and demobilization. Work under this Item shall generally be comprised of the following: a. Setting up the necessary general plant, including shops, storage areas, CONTRACTOR's and ENGINEER's field offices, and such sanitary and other facilities as are required by local or state law or regulation. b. The cost of required insurance, bonds, permits, work schedule and subsequent updates and any other initiation of the Contract work. c. Attendance at meetings. d. Any and all required Public Notifications and shutdown notices. e. Construction schedule and updates to schedule. f. Demobilization of all temporary facilities as described herein. Removal of trash and debris generated during the duration of the Work. g. Final restoration of all staging and work areas after demobilization operations. 2. Item 2 - Maintenance and Protection of Traffic Under this Item, the CONTRACTOR shall furnish all labor, materials, tools and equipment required to provide all traffic control, flagmen, equipment and devices, barricades, etc., necessary for the completion of the work under this Contract, and as necessary to meet the requirements of the various permits issued for the Project. The work under this Item includes Maintenance and Protection of Traffic Control Plans, all required signs, electronic signs, signals, notifications and all other associated work. 3. Item 3 - Clearing and Grubbing Under this Item, the CONTRACTOR shall furnish all labor, materials, tools and equipment required to complete clearing and grubbing as indicated on the Contract Drawings and as required to complete all other aspects of the Project. The Work under these Items generally includes, but is not limited to the following: a. Clearing and grubbing as indicated on the Contract Drawings, and as required to complete the Project. b. Brush clearing shall be performed utilizing heavy duty mowing equipment or other industry standard approved methods that have been reviewed and approved by the Engineer. c. Trees and brush too large to mow/mulch shall be hand cut with chain saws and/or brush saws. d. All material cleared and grubbed shall be removed and disposed of off-site in accordance with all rules and regulations at no additional cost to the Owner. 4. Item 4 - Soil Erosion & Sedimentation Control Under this Item, the CONTRACTOR shall furnish all labor, materials, tools and equipment required to complete Soil Erosion & Sedimentation Control as indicated on the Contract Drawings and as required to complete all other aspects of the Project. The Work under these Items generally includes, but is not limited to the following: a. Provide soil erosion and sedimentation controls as shown on the Contract Drawings. b. The CONTRACTOR shall be responsible for hiring a third-party New York State licensed Professional Engineer who shall be responsible for development of a Stormwater Pollution Prevention Plan (SWPPP). This shall include obtaining required NYSDEC approvals, submitting all notices, and performing inspections of Soil Erosion & Sedimentation Controls as required. c. Provide protection of trees, shrubs, and/or plants as indicated on the Contract Drawings and as directed by the Engineer.

Post-Bid

Water / Sewer

$800,000.00

Public - County

Site Work

109

19

20

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Grouting, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Plastic Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
77
Bidding Soon
1,019
All Active Projects
447
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 16, 2024

img_map_placeholder

Multiple Locations, Falconer, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

West Side Sewer Extension Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.