BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2024 at 8:00 PM

Updated August 27, 2024

Site work for a water / sewer project in Beaufort, South Carolina. Working plans call for site work for a water / sewer project.

As of 8/26/2024, Project is On Hold: Will repost at a later date. Fishing Pier Repair Work. Scope of Work Remove existing decking and handrail and disposal of materials. Install 2"x6" decking with new 4"x4" posts, 2"x6" top cap and 2"x4" top and midrails. Remove decking on floating dock and dispose of materials. Install new decking, replace pile guides on all piles with new HDPE. Install new bumper rail around entire dock with corners. New 3"x8" cross braces will be added to the front and back sets of piles under pier head. Contract Time: 60 Calendar days from issuance of Notice to Proceed. Liquidated Damages: $200 per calendar day All Bids shall be accompanied by a Bid Bond drawn in favor of the Beaufort County Treasurer of Beaufort County, Beaufort, South Carolina, in the amount of at least five percent (5%) of the bid for the complete work: such Bid Bond representing that the Bidder, if awarded a contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the attorney for Beaufort County, South Carolina. Each bond shall be equal one hundred percent (100%) of the contract amount. A copy of the Bid Bond or Certified Check must be electronically sent with your bid documents through Vendor Registry. The original Bid Bond or Certified Check must be received by the Procurement Services Department within 10 days after the bid due date. Failure on the bidder's part to provide a copy of the Bid Bond or Certified Check by the Bid closing date and time will be considered as a nonresponsive bid and rejected by the County. The Bid Bond shall be forfeited to the County Council of Beaufort County, South Carolina as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within fourteen (14) days after being notified that he has been awarded the Contract. Question Deadline 08/08/2024 at 5:00 PM ET All questions regarding Post-Award Compliance Efforts should be directed to the Compliance Office vie e-mail at dthomas@bcgov.net or (843) 255-2304. Beaufort County reserves the right to reject all proposals and to waive minor informalities and irregularities.

Final Planning

Water / Sewer

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
57
Bidding Soon
761
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

February 26, 2025

Project location map

Multiple Locations, Beaufort, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.