BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Site work, paving and outdoor lighting for a mixed-use development in Eckerman, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

14.43 mi of hot mix asphalt reconstruction, concrete curb and gutter, storm sewer, drainage improvements, sidewalks, streetlighting, traffic signal upgrades, aggregate shoulders, corrugations, guardrail and pavement markings on M-123 from south of Curley Lewis Highway to North Whitefish Road, Chippewa County. This project includes two 5 year and one 3 year materials and workmanship pavement warranty Net classification required for this project is 7025 Cb Control Sec Job No Federal No ST 17011 208427A 25A0753 M 17011 213407A N/A In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of L. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 2508 001 - Hot Mix Asphalt Reconstruction, Concrete Curb and Gutter, Storm Sewer - M-123 This work consists of the determined low Bidder, or the subcontractor(s) indicated in the pass-through warranty obligation folder in the electronic bid file, providing a warranty performance bond for the warranty(ies) listed herein. Below is(are) the warranty(ies) required in this contract along with the locations where the warranty applies, and a listing of the pay items and estimated quantities associated with that warranty type. This work consists of all tree removals and clearing of vegetation 3 inches or greater in diameter required for the project in accordance with sections 201 and 202 of the Standard Specifications for Construction. Due to the potential presence of state and federally protected species, complete all tree removals and clearing between October 1 thru April 14, as shown on the Michigan Tree Removal Dates map and Supplemental Information on pages 2 to 4 of this special provision. This work consists of corrections requested by the Engineer to areas outside the limits of ride quality (such as existing pavement) or to excluded areas that meet the straightedge requirements which will be considered Bump Grinding and will be completed as directed by the Engineer. Ensure all work necessary to address correction areas [as defined in 20SP-501K - Pavement Ride Quality (Mean Roughness Index Acceptance Criteria)] that fall within the limits of ride quality are to be done at no cost to the contract. Ensure all corrections required to bring excluded areas into compliance with the straightedge requirements of subsections 501.03.H or 602.03.I of the Standard Specifications for Construction, are to be done at no cost to the contract. This work consists of collecting, hauling, managing, and disposing of slurry or residue generated by diamond grinding for ride quality on hot mix asphalt pavements. This work consists of constructing a non-textured burnt red decorative Portland cement concrete pavement at the locations specified on the plans. Complete this work in accordance with the standard specifications, except as modified herein. This work consists of constructing a reinforced concrete slab with galvanized steel guardrail posts attached to the slab with adhesive-anchored threaded rods, as detailed on the plans. This work consists of preparing all lawns and slopes on non-freeway projects designated for slope restoration on the plans or as directed by the Engineer and applying topsoil, fertilizer, seed, mulch with mulch anchor, mulch blanket, high velocity mulch blanket, permanent turf reinforcement mat, bonded fiber matrix, or modified mulch blanket to those areas. Ensure turf establishment is in accordance with section 816 and 917 of the Standard Specifications for Construction and Standard Plan R-100 Series, except as modified herein or otherwise directed by the Engineer. The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as ""distribution work,"" starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation. Tunnel, shaft and caisson work of every type and description and all operations incidental thereto, including, but not limited to, shafts and tunnels for sewers, water, subways, transportation, diversion, sewerage, caverns, shelters, aquafers, reservoirs, missile silos and steel sheeting for underground construction. Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and residential building site excavation and preparation, land balancing, demolition and removal of concrete and underground appurtenances, grading, paving, sewers, utilities and improvements; retention, oxidation, flocculation and irrigation facilities, and also including but not limited to underground piping, conduits, steel sheeting for underground construction, and all work incidental thereto, and general excavation. For all areas except the Upper Peninsula, open cut construction work shall also be construed to mean waterfront work, piers, docks, seawalls, breakwalls, marinas and all incidental work. Open cut construction work shall not include any structural modifications, alterations, additions and repairs to buildings, or highway work, including roads, streets, bridge construction and parking lots or steel erection work and excavation for the building itself and back filling inside of and within 5 ft. of the building and foundations, footings and piers for the building. Open cut construction work shall not include any work covered under Tunnel, Shaft and Caisson work. Excavation, site preparation, land balancing, grading, sewers, utilities and improvements; also including but not limited to, tunnels, underground piping, retention, oxidation, flocculation facilities, conduits, general excavation and steel sheeting for underground construction. Underground construction work shall not include any structural modifications, alterations, additions and repairs to buildings or highway work, including roads, streets, bridge construction and parking lots or steel erection.

Award

Roads / Highways

$7,117,555.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

165

10

7

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.