This is a service / maintenance or supply contract in Toronto, Ontario. Contact the soliciting agency for additional information.

1. Supplier Shall Deliver All the Equipment to the Site. General Contractor Shall Receive and Install New Switchboard, Connect to the System, Along With All New Associated Power, Control and Grounding Cables, Conduits, Breakers, Disconnects, Junction Boxes, Etc. General Contractor Shall Use His Own Crane to Unload It From Delivery Truck. General Contractor Shall Use His Crane to Bring the Equipment to the Roof and Then Install It on the Foundation. List App 2. All Coordination and Investigation Required Through Breakers Selection and Preparation of Breaker Shop Drawings Shall Be Done by the Supplier/general Contractor. This Includes Smop Preparation, Switching on/off the Switchboard as Required and Inspection of the Switchboard and the External Controls. 3. Through Construction, Supplier Shall Coordinate With the General Contractor for Smop Preparation and Commissioning of the New Breakers. 4. All the New Breakers Shall Be Electrically Operated (125v Dc/ac) Voltage to Be Verified Before Order. 5. All Breakers Shall Include Close & Open Contacts as Required. 6. All Breakers Shall Include Spring Charging Motor. 7. All Breakers Shall Include Micrologic 6.0 With Lsig Trip Unit. 8. All Breakers Shall Include Indication Lights, on, Off, Trip, Etc. 9. All Breakers Shall Include Overcurrent Trip Switch. 10. All Breakers Shall Include Fuse Control Protection. 11. Breakers Shall Be Provided With Colored Pushbutton Switches as Required 12. Supplier Shall Include in His Price the Training of Rom Operations Team. 13. Supplier Shall Include in His Price the Warranty as Shown on Drawing E8. 14. All Installation Work at the Site Shall Be Done by General Contractor. Supplier Shall Test and Commission the New Breakers 15. Drawings E2 to Es Provided to Clarify the Project Scope, Supplier Scope as Per Drawings E1, E6, E7 & E8. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline: 2024/07/22 05:00:00 PM EDT

Post-Bid

Museum

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
187
Bidding Soon
5,060
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2024

August 29, 2024

Project location map

100 Queens Park, Toronto, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.