BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work and paving for a road / highway in Harbor Springs, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1.34 mi of hot mix asphalt overlay, aggregate shoulders, guardrail and pavement markings on Robinson Road from west Ayr Road to west of Durkalic Road, Emmet County. This is a Local Agency project. DBE Percent Required: 0.00% SBP Percent Required: 0.00% Control Section - STL 24000 , Project No- 215307A Net classification required for this project is 804 Cb or 804 N9-6L In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and N9-6L. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 2603 024 - Hot Mix Asphalt Overlay, Aggregate Shoulders, Guardrail and Pavement Markings on Robinson Road The Engineer anticipates that construction can begin no earlier than May 26, 2026. Completion Date: 7/1/2026 MBE (4.9%), WBE (6.9%)

Award

Roads / Highways

$585,357.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
24
Bidding Soon
248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

May 26, 2026

Project location map

E Robinson Rd, Harbor Springs, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.