BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2025 at 7:00 PM

Updated February 5, 2025

Site work for a museum in Riverside, California. Completed plans call for site work for a museum.

The work to be performed by contractor shall conform to the requirements of all of Divisions of the Specifications, all sheets in Drawings and other related documents, as well as the General Conditions and includes the furnishing of all supervision, labor, materials, tools, equipment, transportation, plans, and services necessary therefore and incidental thereto to complete the project. The work shall consist of, but not be limited to, the following. This Contractor shall provide and accurately locate all General Construction scope of work for the Project as identified, and all other required materials, equipment, and labor not identified, but necessary to complete this Contractors scope of work. This Contractor shall provide a $5,000 (Five Thousand Dollars and no/100) allowance for construction contingencies. This Contractor shall be responsible to document all costs incurred; provide all required documentation within 10 days of all work performed. Such costs shall be reported to the Architect in a timely manner. This allowance shall be listed as a line item on the contractor's schedule of values; a deductive change order will be prepared for any portion of this allowance not used. Provide all labor, materials, and equipment necessary to install new perimeter wrought iron fencing at the front of the Heritage House site and along the West property line per the plans and specifications prepared by Higginson Architects Incorporated. Final Questions Due 12/13/2024 Before 2:00PM PT New Wrought Iron Fencing at the Heritage House Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID A. Where the work requires that a particular existing building element such as a partition, wall, paving, window, or similar element of existing building construction be removed, it is the intention of this specification that such work be a part of the demolition section and not a part of cutting and patching. Refer to individual category scope of work sheets to determine the limits of demolition work for each contractor. B. New work required to replace such removals is considered as a part of the separate sections of the specifications covering similar new construction. C. Where incidental cutting and patching is required for the installation of a specific item or piece of equipment (including piping, ductwork, conduit, etc.), all such cutting and patching is considered to be specified as a part of the section requiring the cutting and patching. D. Contractor shall verify and check all areas to be cut and patched and shall coordinate the work of the various trades involved. E. Where doubt exists as to the size, location, or method of cutting concrete or any other structural element, Contractor shall contact the Architect before proceeding. F. Where doubt exists, Contractor shall distinguish between "cutting and" demolition". G. Unless specifically designated otherwise, existing work cut, altered, or revised to accommodate new work shall be patched to duplicate undisturbed adjacent finishes, colors, textures, and profiles; new work in existing portions shall also be finished to match adjacent existing work unless noted otherwise.

Award

Museum

$120,429.00

Public - City

Site Work

9

28

4

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
606
Active Projects
272
Bidding Soon
3,444
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2025

February 6, 2025

Project location map

8193 Magnolia Ave, Riverside, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.