BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a museum in Riverside, California. Completed plans call for site work for a museum.

QUESTIONS REGARDING RFB: Any questions pertaining to this Request for Bids shall be submitted through online. Deadline for submittal of bid Request for Information (RFIs) is 07/30/2024 by 2:00PM local time. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Work Included: The work to be performed by contractor shall conform to the requirements of all of Divisions of the Specifications, all sheets in Drawings and other related documents, as well as the General Conditions and includes the furnishing of all supervision, labor, materials, tools, equipment, transportation, plans, and services necessary therefore and incidental thereto to complete the project. The work shall consist of, but not be limited to, the following: 1. This Contractor shall provide and accurately locate all General Construction scope of work for the Project as identified, and all other required materials, equipment, and labor not identified, but necessary to complete this Contractors scope of work. 2. This Contractor shall provide a $5,000 (Five Thousand Dollars and no/100) allowance for construction contingencies. This Contractor shall be responsible to document all costs incurred; provide all required documentation within 10 days of all work performed. Such costs shall be reported to the Architect in a timely manner. This allowance shall be listed as a line item on the contractor's schedule of values; a deductive change order will be prepared for any portion of this allowance not used. 3. This Contractor shall provide all Division 01 - General Requirements for the Project per the Plans and/or Specification Sections. 4. If, at any time, this Contractor needs to open or move any temporary fencing in order to accomplish his scope of work then he shall be responsible to do so at no additional cost to the City. This Contractor shall secure any opening(s) created in the perimeter fencing by this Contractor at the end of each workday. 5. If this Contractor's scope of work, as a necessary result, includes the discharge of contaminated liquid of any kind, then this Prime Contractor is to comply with BMP's (Best Management Practices) of the SWPPP SCOPE OF WORK: 2.1 The project includes the construction of new wrought iron fencing to complement the existing historical fencing on site

Post-Bid

Museum

$80,000.00

Public - City

Site Work

5

16

10

8

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
121
Bidding Soon
2,227
All Active Projects
1,031
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

September 9, 2024

img_map_placeholder

8193 Magnolia Ave, Riverside, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.