BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Carlisle, Iowa. Completed plans call for site work for a water / sewer project.

Iowa Highway 5 Water Main Crossing Contract. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 5% of the Bidder's maximum Bid price. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa. In accordance with Iowa Statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to, any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. OWNER reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 45 days after the time set for receiving Bids. The Contract Times will commence to run within 30 days after the Effective Date of the Contract or at the end of the bid acceptance period, whichever is earlier. Contract award shall be made based on the lowest responsive and responsible Bidder. Description: The Project includes the following Work: Installation of approximately 1,300 feet of 12-inch water main, of which approximately 300 feet is trenchlessly installed with steel casing across Iowa Highway 5. The Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before November 15, 2024.

Bid Results

Water / Sewer

$291,653.00

Public - City

Site Work

15

13

4

9

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
39
Bidding Soon
451
All Active Projects
236
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2024

September 5, 2024

img_map_placeholder

IA-5, Carlisle, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.