This is a service / maintenance or supply contract in Lake Buena Vista, Florida. Contact the soliciting agency for additional information.

License Requirements Florida-registered PE The method of Contractor Selection has not been Determined at this time. Project Duration 3-year continuing contract, with a 2-year, optional renewal Question Deadline 07/29/2024 at 6:00 PM ET Online Q&A Yes This is a representation of the types of tasks or work that may be requested by the District, and is not meant to be a comprehensive list. The exact scope of work and scale of the services will be defined during each project initiation. In general, engineering firms must be capable of evaluating, designing and providing construction administration services for the production, treatment, distribution, and/or collection of each utility system owned by the District. The firm will be required to provide feasibility studies, condition assessments, utility coordination, construction administration support, permitting support, cost estimations, and engineering drawing and specification production and support. A summary of tasks related to the assessment, planning, design, and construction services includes, but are not limited to the following: o Capital improvement and utility master planning o Preliminary engineering assessments and conceptual design o Drawing production in the latest versions of AutoCAD, REVIT and Civil 3D o Direct replacement and/or upgrade of equipment design and plan development o Construction administration services; compliance review, inspection and commissioning o Technical Field Investigations/Reporting/Evaluation o Cost Analysis/Rate Study/Rate Comparison Load Forecasting o Provide a cost estimating service which, includes, but not limited to conceptual and detailed estimating, life cycle cost analysis, and constructability analysis, etc.; o Horizontal direction drill ("HDD") and Jack & Bore ("J&B") analysis and design using industry accepted simulation tools. List of experience and competency: o Transmission System Planning & Engineering, including, but not limited to the following: i. Overhead and underground 69kV transmission system design and engineering ii. Transmission Line Route Study iii. Electro-Magnetic Field (EMF) Analysis iv. Design and analysis of structures and foundations v. Pole relocations and/or replacements vi. Project management and coordination vii. Development of drawings, specifications, and other project materials viii. Construction bid preparation ix. Interconnection studies x. LiDAR surveying xi. Renewable energy and grid connection studies xii. Short Circuit, Loadflow (ASPEN and SKM Power Tools) and Various Planning Studies xiii. Project Management o Distribution System Planning & Engineering, including but not limited to: i. Project management and coordination ii. 12.47kV and 5kV distribution system improvements and maintenance iii. Overhead to underground conversions for primary and secondary distribution system iv. Design and manage the upgrade/replacement of aging distribution underground systems (outdoor switchgear, unit substations, padmounted transformers and switchgear, etc.) v. Conductor upgrades and cable replacement projects vi. Construction bid preparation vii. Pole relocations and/or replacements viii. Distribution line extensions ix. Short Circuit, Loadflow (Synergi and SKM Power Tools) and Various Planning Studies x. New development engineering (design the electric & conduit system to serve CFTOD commercial and industrial customers). xi. Renewable energy and grid connection studies o Protection & Control Relay Analysis, relay/equipment settings, schematics and physical installation (69kV Transmission and 12.47kV/5kV Distribution, SCADA interfaces and communication processor programming). Schweitzer Engineering Laboratories (SEL) relay settings and programmable logic competencies o Substation Engineering Design including physical design (civil and structural) and electrical arrangement o Electric Power Generation i. Protection & Control, Auxiliary Systems, Civil/Structural Design ii. Power Plant Design & Construction iii. Power Plant Repair & Outage Support

Conceptual

Power Plant

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
76
Bidding Soon
1,567
All Active Projects
639
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2025

img_map_placeholder

Multiple Locations, Lake Buena Vista, FL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.