BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2025 at 8:00 PM

Updated June 10, 2025

Site work and paving for a bridge / tunnel in Morenci, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge rehabilitation including deck overlay, composite concrete deck with railing, concrete deck patching and approach work on Mulberry Road over Lime Creek, Packard Road over Bear Creek Drain and Britton Highway over the Macon River, Lenawee County. This is a Local Agency project. 7% DBE Participation Required Net classification required for this project is 1001 Fa In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-6L. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Completion Date: 6/26/2026 Control Sec Job No Federal No BFPO 46000 212763A 25A0571 BFP 46000 215144A 25A0572 MIDOT: 2506 034 - Hot Mix Asphalt Resurfacing and Valley Gutter, Aggregate Shoulders and Pavement Markings on Lincoln Lake Avenue Question Deadline 05/30/2025

Bid Results

Bridges / Tunnels

$710,073.00

Public - State/Provincial

Paving, Site Work

69

8

3

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
205
Bidding Soon
2,649
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.