Published September 12, 2024 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Stanberry, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the demolition of a bridge / tunnel.

The proposed work includes the removal of the existing bridge and construction of a 93ft long x 24.5ft wide steel girder bridge on concrete abutments supported by driven piles. The project also includes the placement of rock blanket, minor embankment work, and a bolt on steel guardrail. The project will have some new fence and seeding. The road within the project area will receive a 4 thick layer of crushed stone. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the current version of the Missouri Standard Specifications for Highway Construction. The contractor questionnaire must be on file 7 days prior to bid opening. Question Deadline 08/12/2024 A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE goal for this project is 4%. The right is reserved to reject any or all bids The Contract, if awarded, will be awarded to the lowest responsive, responsible bidder who provides the lowest price complying with the Conditions of the Contract Documents within the Owner's budget. MODOT - Constructing Bridge No. 00100092

Award

Bridges / Tunnels

$606,633.00

Public - County

Demolition, New Construction, Paving, Site Work

23

10

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
30
Bidding Soon
442
All Active Projects
161
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2024

October 18, 2024

img_map_placeholder

Multiple Locations, Stanberry, MO


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Constructing or Improving Bridge No. 00100092

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.