BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a clubhouse / community center in Medford, Massachusetts. Design plans call for the demolition of a clubhouse / community center; for the construction of a clubhouse / community center; and for site work for a clubhouse / community center.

As of October 24, 2024, an architect has been selected and this project is in the design phase. It is anticipated that construction will start in September 2025. The closed solicitation has been included below for reference: Scope Full range or services to design, publicly bid, construct and close out project. Services included but not limited to architecture, structural, civil, mechanical, electrical, fire protection, plumbing, environmental, sustainability, and accessibility. New Community Center & Resiliency HUB at (AMP-1) Willis Ave. Family Development. Existing Community Center to be demolised and is located at 148 Exchange Ave., Medford, MA. Time Period for Completed Project 30 months. Questions must be sent in writing to Gabriel Ciccariello at gciccariello@medfordhousing.org no later than the close ofbusiness on Friday, August 9, 2024 SCOPE OF WORK The Scope ofwork includes, but is not limited to: o An assessment of all code issues, site issues, and location ofnew community building o The MHA anticipates that unsuitable or contaminated soils may be present on site. (C) A community space that is able to be subdivided approx. 2,000 to 3,000sf o Office area for community center staff o Restrooms as required by code o Community kitchen. Not a commercial kitchen o Healthy indoor air quality is ofkey importance. Material selection should be Focused on non-toxic choices. Mechanical systems will have high level ofoutside air Circulation throughout the building. o Medford, MA has adopted the Stretch Code, so new building must meet Stretch Code o All associated MEP, site, environmental, and structural work associated with the building

Design

Clubhouse / Community Centers

$1,500,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
149
Bidding Soon
2,712
All Active Projects
1,112
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

September 1, 2025

img_map_placeholder

Willis Ave, Medford, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.