BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work, paving and outdoor lighting for a mixed-use development in Arlington, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

Work shall include the construction of a single lane roundabout at the intersection of Smokey Point Blvd and 188th Street SW. Elements of the project also include the installation of stormwater facilities, pedestrian and roadway illumination systems and rapid rectangular flashing beacons (RRFBs), new water and sewer facilities, sidewalks, hardscape buffer strips, and landscaping. Federal Aid #STBGUM-CM-2691(013) The Engineer's estimate for the project is $5,110,000.00. The City of Arlington expressly reserves the right to reject any and all bids, to waive minor irregularities or informalities, and to further make award of the project to the lowest responsible Bidder as it best serves the interest of the City of Arlington. No proposal may be withdrawn after the time stated above, or before Award of Contract, unless said award is delayed for a period exceeding sixty (60) calendar days after opening of the proposals, or Bidder withdraws proposal due to error in accordance with Section 1-03.1 of the WSDOT Standard Specifications. Proposals must be submitted on the forms provided with the contract documents. All proposals must be accompanied by a bid deposit in the form of a certified or cashier's check, or bid bond, for not less than five percent (5%) of the total amount bid, including additives and alternates, if any. Refer to Instructions to Bidders for more information Plans and specifications are available for viewing at the City of Arlington Public Works Department, 154 W. Cox Ave, Arlington, Washington 98223. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. QA date - 7-17-2025 Questions shall be submitted in writing to the Project Administrator, contact information shown below, and be received at least one week prior to the specified bid opening date. Questions received after this date may not be responded to. Responses to questions will be submitted in writing by the City through addendum; verbal responses shall not be considered official.

Award

Roads / Highways

$4,524,126.00

Public - City

Outdoor Lighting, Paving, Site Work

89

8

10

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
146
Bidding Soon
3,046
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

October 27, 2025

Project location map

Smokey Point Blvd & 188th St NE, Arlington, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.