Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Saint Louis, Missouri. Completed plans call for the renovation of a educational facility.
The work shall be completed by a qualified mechanical contractor who shall submit a turn-key proposal for the Design/Build HVAC work for retrofit systems installation work at Blades Elementary School, John Carey ECC, Oakville Middle School, Oakville High School, Rogers Elementary School, Trautwein Elementary School, and Washington Middle School as specified and as required by code. Only Design-Build contractors meeting the requirements within the specifications will be considered as qualified bidders. Question Deadline 09/13/2024 Should a Bidder find discrepancies in, or omission from, drawings or other documents, or should he be in doubt as to their meaning, he/she shall immediately notify in writing: Facility Solutions Group 901 Horan Drive, Suite 100 Fenton, MO 63026 Attn: Mr. Dan Childress dchildress@fsg-stl.com who will send written instructions to all Bidders. All written requests must be received no later than three (3) days prior to the published bid due date Project Locations: Blades Elementary School 5140 Patterson Rd, St. Louis, MO 63129 John Carey Early Childhood 3155 Koch Rd, St. Louis, MO 63125 Oakville Middle School 5950 Telegraph Rd, St. Louis, MO 63129 Oakville High School 5557 Milburn Rd, St. Louis, MO 63129 Rogers Elementary School 7700 Fine Road, St. Louis, MO 63129 Trautwein Elementary School 5011 Ambs Rd, St. Louis, MO 63128 Washington Middle School 5165 Ambs Rd, St. Louis, MO 6312 Bidders must provide, with the bid, a Bid Bond in the amount of 5% of the proposed contract sum. No cashier checks allowed. Payment and Performance Bonds in the amount of 100% of the proposal will be required by the successful primary contractor using sub-contractors. The cost of the bonds will be the responsibility of the selected contractor. All Bidders whose bids are in excess of $5,000.00 must provide with their bid the Federal Work Authorization Program ("FWAP") Affidavit of Compliance and Verification Form with respect to employees working in connection with the contracted services, affirming enrollment in a FWAP. No proposal can be withdrawn after the time set for the receiving of proposal and pending consideration and action upon same by the Board of Education. In no event, however, will action upon proposals be deferred beyond forty-five (45) days from the date hereinbefore set forth for receiving of same. The Board of Education reserves the right to accept or reject any or all proposals and to waive technicalities. The successful contractor will be required to agree to the contract, which will be based on the applicable AIA contract, prepared by Mehlville School District for the project.
Post-Bid
Educational
$1,500,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2024
May 26, 2025
Multiple Locations, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Aug 13 2024
Saint Louis, MO
Bid Date: Aug 01 2024
Saint Louis, MO
Bid Date: Aug 19 2024
Saint Louis, MO
Bid Date: Aug 21 2024
Saint Louis, MO
Bid Date: Oct 25 2024
Saint Louis, MO
Bid Date: Sep 18 2024
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Dec 03 2024
Saint Louis, MO
Bid Date: Aug 20 2024
Saint Louis, MO
Bid Date: Aug 20 2024
Saint Louis, MO
Bid Date: Aug 22 2024
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Jul 30 2024
Saint Louis, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.