BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, new construction and renovation of a mixed-use development in Albuquerque, New Mexico. Completed plans call for the construction of a 98,550-square-foot, two-story above grade multi-residential development; for the renovation of a 42-unit multi-residential development; for the demolition of a multi-residential development; for paving for a multi-residential development; 2,052-square-foot clubhouse / community center; and for site work for a multi-residential development.

The Project consists of The renovation of 42 Existing single-family and duplex homes, the Construction of 46 New Units, and the Construction of a New Community Building with landscaping at both property locations. Davis- Bacon Wage Rates apply. As of September 3, 2024, addendum 5 has been issued, extending the bid date to September 10, 2024. DESCRIPTION OF ALTERATIONS WORK A. Scope of demolition and removal work is indicated on drawings. B. Scope of alterations work is indicated on drawings. C. Hazardous Materials Remediation: The existing project site has been identified to include Asbestos Containing Materials (ACMs) which are to be removed and remediated. Reports identifying ACMs have been included in the Project Manual. D. Plumbing: Alter existing system and add new construction, keeping existing in operation. E. HVAC: Alter existing system and add new construction, keeping existing in operation. F. Electrical Power and Lighting: Alter existing system and add new construction, keeping existing in operation. G. Telephone: Alter existing system and add new construction, keeping existing in operation. Construction is anticipated to start fourth quarter 2024 and take approximately 18 months to complete. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

GC Bidding

Multi-Residential

$18,000,000.00

Public - City

Demolition, New Construction, Paving, Renovation, Site Work

127

26

76

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
152
All Active Projects
58
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

October 15, 2024

img_map_placeholder

112 60th St NW, Albuquerque, NM

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.