BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Appleton, Wisconsin. Completed plans call for the renovation of a water / sewer project.

AWWTP Organic Rankine Cycle Generator Work consists of installation of owner procured ORC generators and remote radiators. Bidder will be required to have Performance Bond/Labor and Material Payment Bond in the amount of 100% of the Contract. Cost of Bond shall be included in Bid. No bid shall be received unless accompanied by a bid bond equal to five percent of the bid, payable to the City as a guarantee that if the bid is accepted, the bidder will execute and file the proper contract and bond within 10 days from the date the lowest responsible bidder's bid is accepted. If the bidder fails to file such contract and bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. The City reserves the right to reject any and all bids or to accept any bid deemed for the best interests of the City and to waive any informalities in the bidding. The award of this Contract under this Advertisement for Bids is contingent upon compliance with the City obtained Energy Innovation Grant Program. This procurement will be subject to regulations contained in Wisconsin Administrative Code and appropriate State Statutes, and the use of American made iron, steel, manufactured products, and construction products. Any Contract awarded under this Advertisement for Bids must demonstrate compliance with Davis Bacon wage rates and utilize a minimum of 15% of the labor hours spent on the project hired out to a registered apprenticeship program. Pre-Qualification: Yes Question Deadline 08/01/2024 at 3:00 PM CT Questions or requests for clarification by bidders must be submitted in writing. Direct questions to Donohue & Associates, Inc. (Mike Stohl) or phone: (920) 208-0296. Verbal answers are not binding on any party.

Award

Water / Sewer

$563,500.00

Public - City

Renovation

28

17

7

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
20
Bidding Soon
338
All Active Projects
132
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

September 15, 2024

img_map_placeholder

2006 E Newberry St, Appleton, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.