BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Modesto, California. Completed plans call for the renovation of a fire / police facility.

The Stanislaus County Sheriff's Department (County) is seeking bids from qualified and experienced Contractors with valid C-10 Electrical contractor's license and current DIR registration numbers to provide electrical and conduit services for the new welding project located at the horse stalls adjacent to the K9 building . The Stanislaus County Sheriff's Department (County) is seeking bids from qualified and experienced Contractors with valid C-10 Electrical contractor's license and DIR registration to perform the Work described in Part II, Exhibit A at the horse stall adjacent to 450 E Hackett Rd. Modesto CA. Duration- The Contractor must achieve Substantial Completion within 45 days ; The Contractor shall achieve Final Completion within 15 days after Substantial Completion. Project Type Bid Response Types Line Items Bid Bond Bid Response / Documentation Type of Award Lump Sum Categories 238210 - Electrical Contractors and Other Wiring Installation Contractors Bid Bond Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 08/06/2024 at 5:00 PM PT Online Q&A Yes Contact Info Yer Tapia 209-525-4382 TapiaY@stancounty.com Excludes: EMT conduit, fitting, support, wire, lighting fixtures, and devices. Phase Two (2): o Provide 800Amp power from secondary side of existing DRC, TID transformer to 800Amp Fuse Disconnect by undermining CMU wall and trenching parallel to wall out to location near barn, exact location to be shown on job walk. o Power to feed 800Amp, 240Volt fuse disconnect. o Disconnect to feed 100Amp Panel "K9" in new programs yard and 600Amp Panel "Barn1A" for new welding site inside covered barn (old horse stall area). o 600Amp Barn Panel to feed 100Amp sub-panel as well as step-up transformer from 120/208v to 277/480v to welders and compressor from 600Amp barn panel. o From 100Amp "Barn1B" sub-panel (all on Phase-2) o EMT stubs, convert from PVC to EMT for all connections. o Mount all power gear and light fixtures. o Run all EMT to junction box locations. o Pull all wire and terminate. o Install devices (receptacles, switches, and disconnects). o (25) 120v receptacles inside barn coming out from 100A sub-panel "Barn1B". o (21) 120v quad- receptacles for inside Conex boxes (3 in each 40ft and 2 in each 20ft). o (7) 8' Vapor Tight LED Light Strips over welding booths. o (14) 8' Vapor Tight LED Light Strips for rest of barn area. o (26) 8' Vapor Tight LED Light Strips inside Conex boxes (4 in each 40ft and 2 in each 20ft) Location to be determined. o (4) 120/208v, 150w LED Flood Lights with 2-bull horn brackets, 2-per light and with motion sensors for programs yard area. o (2) future stub-ups for future lighting under new awning on the north side of barn. o (8) single-pole switch inside each Conex box to control lighting. o (3) switches with motion for lighting under barn area (front, side and middle location). o All electrical equipment shall be outdoor rate. o All underground conduits feeders shall be PVC-40.

Bid Results

Fire / Police

$402,282.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
364
Active Projects
185
Bidding Soon
3,319
All Active Projects
1,380
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 27, 2024

September 26, 2024

November 25, 2024

img_map_placeholder

450 Hackett Rd, Modesto, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.