BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2024 at 8:00 PM

Updated December 17, 2024

Site work for a water / sewer project in Oak Park Heights, Minnesota. Completed plans call for site work for a water / sewer project.

As of September 26, 2024. Project is not yet awarded; anticipated award date is December. A. Project Name: Well No. 3 for the City of Oak Park Heights B. The well has obtained financing from EDA and PFA. Contractors shall comply with the contract packet requirements. C. Contractors shall submit documentation for weekly payroll reports that comply with Davis bacon and state wage rate requirements, BABA products, etc. D. Contractors shall submit documentation of good faith efforts for Minority and Disadvantaged business. Project minority goal 2.9 percent. E. Contractors shall submit documentation of good faith efforts for Women owned business goals. Project woman goal 6.9 percent. F. Description of Work: Project consists of the construction of a 18-inch steel cased 300-foot deep open hole Jordan aquifer well. The well will provide water supply for the municipal water system. The well is to be dynamited, developed, and test pumped. The well is to be televised and water quality tests will be taken. G. The Owner or Engineer may re-design the production well, including moving its proposed location if the proposed site is not approved by the Minnesota Department of Health. The production well may also be cancelled by the Owner if the site is determined unsuitable for a production well. Question Deadline 09/06/2024 Questions received less than 10 days prior to the date for Opening of Bids may not be answered. Description: Work consists of the construction of an 18-inch steel-cased, 300-foot deep open hole Jordan aquifer well, to be constructed in accordance with Municipal Well Standards. Additional Description: All plan holders who order electronic proposals through Online will receive addenda as they are released; however, it is the Contractors full responsibility to ensure they have received all addenda prior to the submittal of bids.

Bid Results

Water / Sewer

$656,272.00

Public - City

Site Work

4

15

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
131
Bidding Soon
1,637
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

October 17, 2024

Project location map

To Be Determined, Oak Park Heights, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.