BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Collierville, Tennessee. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

This project shall consist of traffic control, saw cutting asphalt, saw cutting of concrete, excavation of material, installation of water main, backfilling, testing of water main, installation of water services, installation of meter boxes, finish grading, concrete work, sodding and other items of work for a completed project. Project Description: A. The work consists of the furnishing and installation of a Ductile Iron Pipe (I as called for on the plans with all labor, materials and appurtenant completed project. X Ç)>Water Main required for a B. Shop drawings and materials must be submitted and approvedwthe Town prior to use in the project. C. The backfilling of all pipes shall be per ed dr lown in the plans. This includes and all excess soil and asphalt are to be removed from the project There is no storage on site. The Contractor is responsiblefc excavated material. E. The Contractor for the safety and protection of all persons, property and witfîjiis or her work. F. The worleileclej trash; mud will not be allowed on existing roadways. G' construction schedule at the preconstruction conference lead fames. No Notice to Proceed shall be issued without a O1 J. hall insure that work area is clear of encroachment into property outside rights-of-way. nractor shall not close off the use of public facilities until the completion of one construction and provides an alternative usage approved by the Town. The Contractor shall notify the Town seven days prior to closing a road. K. All work shall be constructed as per the Town of Collierville Construction Standards. L. The Contractor shall notify the Town Engineer 72 hours (3 days) in advance of any intersection closure. M The Contractor shall be responsible for acquiring storage areas for construction. N. Weekend Work: No weekend work allowed unless extenuating circumstances require it with approval of the Town Engineer. 0. A Notice to Proceed will be provided at the start of each phase. Substantial Completion will be provided at the end of each phase. Substantial Completion will be completed on the prior phase before the Notice to Proceed is provided for the next phase. Liquidated Damages will be assessed for each phase. Refer to the Special Provisions (Phases of Work) section for the exact number of days to complete each phase of work. The entire project has a Substantial Completion of three hundred sixty-five (365) consecutive calendar days.

Post-Bid

Water / Sewer

$810,000.00

Public - City

Paving, Site Work

36

20

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
97
Bidding Soon
834
All Active Projects
375
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 21, 2024

September 20, 2024

September 20, 2025

img_map_placeholder

N Rowlett St, Collierville, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.