BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in San Antonio, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Deadline for questions is scheduled for August 6, 2024 at 4:00PM (CT). The consultant's construction estimated for this contract is: $500,000.00. This project does not include hazardous environmental work. This project requires 10 project signs. Small Business Economic Development Advocacy (SBEDA) Program Compliance - Respondents shall meet the subcontracting requirements as stated on 050.01 Form and on the Subcontractor/Supplier Utilization Commitment Form posted with this solicitation on the City's website. The Subcontractor/Supplier Utilization Commitment Form will be determined off of the base bid amount. Local Preference Program Ordinance - For more detailed information on the Local Preference Program Ordinance, see solicitation document "040 Standard Instructions to Respondent", section 5. Veteran-Owned Small Business Preference Program - For more detailed information on the Veteran-Owned Small Business Preference Program, see Ordinance No. 2013-12-05-0864 and solicitation document "040 Standard Instructions to Respondent", section 6. Responsible Bidder Ordinance - For more detailed information on the Responsible Bidder Ordinance, see Ordinance No. 2023-01-26- 0041 and solicitation document "040 Standard Instructions to Respondent", section 7. Heat Illness Ordinance - For more detailed information on the Heat Illness Ordinance, see Ordinance No. 2023-08-31-0585 and General Conditions for Construction Contract, Article X.1.5 and Art.X.2.3(a). Bid Protest Procedures - See solicitation document "040 Standard Instructions to Respondent", section 11 Wage Decision - Bidder shall meet the prevailing wage rate requirements established for this contract and shall reference the wage decision posted with this solicitation on the City's website. Project Duration This task order contract shall be terminated two hundred and seventy (270) calendar days after 1) issuance of the first task order or 2) thirty (30) days after full execution of the contract, whichever comes first. Full execution of the contract is defined as the time the contract is available on the City's Primelink system. The construction time (in calendar days) for each individual site will be negotiated between the City Engineer or Project Manager and the Contractor. The Contractor will be expected to begin construction for each individual site in accordance with Article 1- General Provisions, Section 1.2.4, Notice to Proceed and Commencement of Contract Times in the General Conditions-City of San Antonio Construction Contracts. Liquidated damages for construction time will be assessed on a per task order basis should the contractor fail to complete the construction in the specified working days as negotiated by the City Engineer or Project Manager. The Contractor shall refer to section 4.2.6 of the general conditions for claims for additional contract time due to inclement weather.Project Scope Project construction may include but is not limited to: crack seal application, herbicide treatment, and any other items required due to the site conditions to accomplish the project scope. Quantities included in this contract, as well as the entire bid amount are not guaranteed. Unit prices established shall remain valid throughout the duration of the contract. Project Location Project locations are not provided in this contract and could be spread throughout the City. Each project site may be issued as a separate Task Order or the City may include a grouping of projects as a separate task order. Quantities will be provided to the Contractor when the City submits the task order. It is anticipated that some project sites may require working time restrictions. No additional cost will be paid to the contractor for reduced working times.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

14

10

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
25
Bidding Soon
1,953
All Active Projects
762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

September 26, 2024

img_map_placeholder

Multiple Locations, San Antonio, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.