BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2024 at 8:00 PM

Updated October 11, 2024

Site work for a service station / car wash facility in Goleta, California. Completed plans call for site work for a service station / car wash facility.

Amtrak is initiating the procurement to select an General Contractor ("GC") to perform construction services for the installation of a new train car wash in Goleta, California. Project Engineer: Project Engineer's status relative to the construction will be delineated in writing by the Contracting Officer prior to the pre-construction conference. "COTR" (Contracting Officer's Technical Representative) is corresponding term in General Provisions. Where the Specifications refer to the "Owner" it shall mean the Project Engineer, who is representing AMTRAK and acting as agent for the "Owner" for the Work during construction. 3. Project construction will be administered by AMTRAK 30th Street Station - 4 th Floor SW, 2955 Market Street, Philadelphia, PA 19104. 1.4 WORK COVERED BY CONTRACT DOCUMENTS A. The Work of the Project is defined by the Contract Documents and consists of, but not limited to, the following: 1. The demolition and disposal of the existing car wash system equipment consisting of: storage and process tanks, spray and rinsing arches, pumps, process piping, rotating brush assemblies, blower assemblies, and any miscellaneous equipment located inside the car wash facility; work includes any associated electrical, control panels and wiring, mounting concrete saw cutting, and miscellaneous materials, etc., as shown in the plans and specified herein to have a complete and operational system. 2. Supply and installation of new car wash system equipment, including but not limited to the supply of Bulk Storage Tanks, Water Storage Tanks, Mixing Tanks, Mixers, Process Pumps, Acid Arch, Brush Modules, High Pressure Arch, RO Arch, Blower System, Splash Walls, Wash Control Center, Motor Control Center, Human Machine Interface Panel, Air Control Panel, Instrumentation, Float Switches, Transmitters, and including all associated equipment, motors, and materials, etc., shown on the plans and specifications to have a complete and operational system 3. Installation of a new foundation, concrete apron, curb, transition slab, swale, including, reinforcements, equipment support pads, rail installation, and including all materials, excavation, equipment, testing, characterization of soils for disposal, disposal of allexcavated soils, supply of new backfill material, shoring, etc., as shown on the plans and specifications to have a complete and operational system. 4. Installation of drain line including, materials, piping, equipment, testing, characterization of soils for disposal, disposal of all excavated soils, supply of new backfill material, excavation, shoring, etc., as shown on the plans and specifications to have a complete and operational system. 5. Creation and implementation of programming to operate the car wash system as a whole and required modes of operation for the car wash as determined by the Owner.

Post-Bid

Service Station / Car Wash

$3,000,000.00

Public - Federal

Site Work

43

18

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
63
Bidding Soon
642
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

September 30, 2024

Project location map

25 S La Patera Ln, Goleta, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.