BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lindsay, California. Working plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The owner has selected a Design Builder. A timeline for construction has not yet been established. All-Concrete Design Build Skatepark Project Ability to complete design and construction of a prefab / precast all-concrete skatepark. If there are any questions, please direct them to: Armando da Silva, Recreation Director City of Lindsay 860 N. Sequoia Ave. Lindsay, CA 93247 559-562-5196 An executed copy of the contract and purchase order will be issued to the successful bidder that shall constitute acceptance of the Bidder s Proposal. The City reserves the right to reject any or all proposals. Time of Completion The Contractor shall complete all work as identified in this bid proposal in no more than 60 calendar days from the issuance by the City of a Notice to Proceed, which will occur immediately after this bid contract has been signed by both parties. If work is not completed in specified time frame and no approved change orders extending contract time have been approved, the Contractor shall pay the sum of $250.00 per day beyond the contract completion time in the form of liquidated damages. Contractor shall comply with all applicable laws, rules, regulations and ordinances in its performance of this contract.

Pre-Construction/Negotiated

Playgrounds / Parks / Athletic Fields

$185,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
16
Bidding Soon
359
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

December 23, 2024

img_map_placeholder

850 N Elmwood Ave, Lindsay, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.