Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 23, 2024 at 8:00 PM
Updated August 24, 2024
Site work and outdoor lighting for a civil project in Plankinton, South Dakota. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.
IM 0907(93)310, Aurora County - PCN 09P1 Road Closure Gates on I90 at Exit 310 (US281) If bidding $250,000 or more, bidders must be prequalified in accordance with the Special Provision for Prequalification of Bidders contained in this Proposal for: Work Type 10 - Lighting & Signals. Field Work Completion Date June 27, 2025 If You Submit a Bid for This Project, a Bid Bond, Certified Check, Cashier's Check, or Bank Draft Will Be Required for Not Less Than Five (5) Percent of the Total Amount of the Bid. The successful bidder will furnish a performance bond in a sum equal to the full amount of the contract, prior to contract award. Therefore, please provide the performance bond as soon as possible after letting. The performance bond will not be returned for one (1) year after the completion of the projects. Questions regarding the plans and/or proposal should be directed to: Jay Peppel at 605-995-3340 or Travis Holthaus at 605-995-3341 or Monte Rice at 605-995-3302. The SDDOT reserves the right to reject any or all bids. If hand delivering, address the envelope to: Monte Rice, Region Design Engineer, Department of Transportation , 1300 S Ohlman St, Mitchell, SD 57301 If using the US Postal Service, address the envelope to: Department of Transportation, Monte Rice, Region Design Engineer, PO Box 1206, Mitchell, SD 57301 SDDOT: Road Closure Gates on I90 at Exit 310 (US281)
Award
Roads / Highways
$705,979.00
Public - State/Provincial
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2024
September 16, 2024
I90 & US HIGHWAY 281, Plankinton, SD
Related To This Project
Plankinton, SD
--
Plankinton, SD
--
Plankinton, SD
Bid Date: May 07 2025
Plankinton, SD
Bid Date: Jul 14 2025
Plankinton, SD
Bid Date: Jun 05 2024
Plankinton, SD
--
Plankinton, SD
Bid Date: May 21 2025
Plankinton, SD
Bid Date: Apr 29 2025
Plankinton, SD
Bid Date: May 28 2020
Plankinton, SD
Bid Date: Jul 02 2020
Plankinton, SD
--
Plankinton, SD
Bid Date: Jun 15 2023
Plankinton, SD
Bid Date: Jun 15 2023
Plankinton, SD
Bid Date: Feb 02 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
