Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 24, 2024 at 8:00 PM
Updated October 1, 2024
Demolition, site work and addition to a water / sewer project in Boerne, Texas. Conceptual plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.
The City of Boerne is requesting Statements of Qualification (SOQ) from qualified firms to provide engineering services for an expansion of the City's Wastewater Treatment and Recycling Center (WWTRC). There is no expressed or implied obligation for the City of Boerne to reimburse responding firms for any expenses incurred in the preparation of a SOQ in response to this request. The City reserves the right to increase or decrease the scope of work related to this project as outlined in this RFQ after a firm is selected to accommodate changes in the needs of the City and serve the best interests of the City. The intent of this Request for Qualifications (RFQ) is to provide information so that the firm can define the level of expertise, experience, personnel and approach necessary to perform the required services in a timely and cost-effective manner. The City reserves the right to reject any or all Statement of Qualifications. The highest ranked firms may be invited to enter into contract negotiations with the City. If an agreement cannot be reached with the highest ranking firms, the City shall notify the firms and terminate negotiations. The second highest firms may be contacted for negotiations. The process may continue until successful negotiations are achieved. The City reserves the right to terminate negotiations with any, and all firms should it be in the City's best interest. The City of Boerne's WWTRC is located along Old San Antonio Road and was constructed in 2013. The WWTRC has a treatment capacity of 1.4 million gallons per day (mgd) on an annual average basis, with the following TCEQ permit limits are: 5 mgl/L of CBOD5, 12 mg/L of TSS, 2 ml/L of Ammonia-N and 0.5 mg/L of Total Phosphorus. The WWTRC provides Type I reclaimed water per the Texas Reclaimed Water Regulations (30 TAC 210). The City of Boerne seeks the services of a qualified consulting engineering firm to provide engineering services required to develop construction plans, technical specifications, bidding and construction phase support, surveying, permitting assistance and other related services. All work shall be in accordance with all applicable local, state, and federal rules, regulations, and standards. Each consultant shall examine all RFQ documents and judge all matters relating to the adequacy and accuracy of such documents. Any inquiries, suggestions, or requests concerning interpretation, clarification, or additional information pertaining to the RFQ shall be made in writing to the Utilities Director. All questions, clarifications, or comments should be directed to Taylor Hill, Utilities Construction Project Manager, at thill@boerne-tx.gov or 830-431-5270. Question Deadline 08/09/2024 The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
$600,000.00
Public - City
Addition, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2025
Multiple Locations, Boerne, TX
Related To This Project
Boerne, TX
Bid Date: Aug 13 2024
Boerne, TX
Bid Date: Nov 08 2024
Boerne, TX
Bid Date: Aug 14 2024
Boerne, TX
--
Boerne, TX
Bid Date: Oct 15 2024
Boerne, TX
--
Boerne, TX
--
Boerne, TX
--
Boerne, TX
--
Boerne, TX
Bid Date: Jul 11 2024
Boerne, TX
Bid Date: Sep 09 2019
Boerne, TX
--
Boerne, TX
Bid Date: Jun 06 2024
Boerne, TX
--
Boerne, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.