BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Wood River, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work shall consist of removal and replacement of approximately 30,400 SF ofexisting sidewalk in various locations throughout Wood River. All proposals must be made on forms furnished bythe City, and the entire set of documents submitted intact. The City ofWood River reserves the right to not open asole bid and to waive, ornot to waive, any irregularities inthe bids and to determine which isthe lowest and best bid for the work. The scope of work under this contract includes furnishing all labor, materials, and equipment necessary to sawcut, remove, properly dispose of concrete sidewalks, drives, and curb; and construct the sidewalk, driveways and curb improvements as specified herein. The contractor shall be responsible for determining all methods, equipment, investigations, layout and supervision to achieve the end product. The contractor shall perform all work on this project to the satisfaction of the Director of Public Services. Major items of work shall be paid for at an appropriate contract unit price for each item specified in the "Schedule of Prices" herein. All other items of work such as mobilization, cleanup, restoration, etc. and non-work items such as bonds, insurance, etc. shall not be paid for separately but shall be considered as incidental to the cost of the construction. All work, materials, and equipment shall be subject to the appropriate requirements specified herein, the "Standard Specifications for Road and Bridge Construction" in Illinois, adopted January 1, 2022 the latest edition of the 'Manual on Uniform Traffic Control Devices for Streets and Highways", and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids. SECTION 3.2: SCHEDULING The contractor shall notify resident or business 48 hours before starting work within their property frontage and the Director of Public Services 24 hours before starting any work. The contractor shall coordinate any work that results in restriction of access to the owner's property with the owner of the property. Maximum closure for driveways, alleys, or streets shall be seven (7) calendar days. First location for sidewalk improvements shall be the Roundhouse, 633 N Wood River Ave, Wood River, IL 62095.

Award

Sidewalks / Parking Lot

$468,343.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
50
Bidding Soon
864
All Active Projects
348
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 29, 2024

img_map_placeholder

Multiple Locations, Wood River, IL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.