BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2024 at 7:00 PM

Updated December 7, 2024

Site work for a water / sewer project in Lansing, Michigan. Working plans call for site work for a water / sewer project.

As of December 6, 2024, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. Project Description: The City of Lansing has purchased 5 tanks to replace existing tanks: 3 Ferric Chloride and 2 Sodium Hypochlorite. The Work includes the following major items: 1. Replacement of three Ferric Chloride Storage Tanks within the South Chemical Building. 2. Replacement of two Sodium Hypochlorite Storage Tanks within the Hypochlorite Storage Building. 3. Removal and replacement of the roof on the two chemical storage rooms to facilitate replacement of the existing Chemical Storage Tanks. 4. Painting of the interior of two chemical storage rooms. 5. Removal and replacement of electrical and HVAC equipment hung from the interior ceiling of the two chemical storage rooms. 6. Removal or replacement of chemical fill lines, suction lines, drain lines, vent lines, process water lines, and air lines associated with chemical tanks. 7. Instrumentation and controls. Reference Number 0000361918 Delivery Point: Lansing, Mi Installation of Ferric Chloride and Sodium Hypochlorite Storage Tanks - Re-bid Location: The location of the proposed construction for the project known as, is 1625 Sunset Ave., Lansing MI. 48917 Any contractual or Bid package questions should be directed to Marilyn Chick, Purchasing, at (517) 483-4282, marilyn.chick@lansingmi.gov or for Technical questions contact Bill Brunner, Wastewater Division @ (517) 483-4018, Bill.Brunner@lansingmi.gov Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - FOB Destination - Insurance Required - Local Service Required - Prevailing Wage Required - Safety Standards Plan Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % A Bid Guaranty (in accordance with Federal Circular No. 570) in the amount equal to but not less than 5% of the total amount of the proposal shall accompany all bids. Certified checks, bank drafts, negotiable U.S. Bonding agencies must be approved for doing business in the State of Michigan. No off-shore bonding agencies will be accepted. The City reserves the right to accept any bids, to reject any or all bids and to make the award in the best interest of the City. Question Deadline 09/13/2024

Final Planning

Water / Sewer

$145,000.00

Public - City

Site Work

51

49

49

8

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
157
Bidding Soon
2,289
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

June 6, 2025

Project location map

1625 Sunset Ave, Lansing, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.