Demolition, site work and renovation of a water / sewer project in Wylie, Texas. Completed plans call for the demolition of a water / sewer project; for site work for a water / sewer project; and for the renovation of a water / sewer project.
Demo / cut & cap / plug existing Influent Line. Influent Line Influent Line and Building modifications inside the existing Lab & Chlorine Building Remove and Replace Sink and Cabinet as needed Remove and Replace Floor as needed Slip line Influent Line Replace Sink and Associated Plumbing Tie-Ins at Existing Aeration Unit and Primary Treatment Diversion Unit Influent Line Manhole including 4" stub out and cap 1 foot outside Manhole Remove and replace existing access road Coordination with other Contracts and Packages Job site cleanup and proper disposal for work under this subcontract is to be carried out daily. Maintenance of Record Drawings for all work under this subcontract, provide information to CMAR each month with application for payment. All work to be coordinated with CMAR's Project Superintendent. Payment and Performance bonds per Subcontract Agreement. Equipment mobilization and demobilization. Alternative 1 Scope: Modify Primary Treatment Diversion Unit Remove & replace Headwall etc. at Temporary Storage Unit Remove & replace Overflow Line Alternative 2 Scope: Demo Headwall Cut and cap existing Overflow Line Question Deadline 08/08/2024 All questions about the meaning or intent of the Contract Documents shall be posted to online at least 7 calendar days prior to the scheduled proposal opening o Influent Line and Building modifications inside the existing Lab & Chlorine Building Remove and Replace Sink and Cabinet as needed Remove and Replace Floor as needed Slip line Influent Line Replace Sink and Associated Plumbing o Tie-Ins at Existing Aeration Unit and Primary Treatment Diversion Unit o Influent Line Manhole including 4" stub out and cap 1 foot outside Manhole o Remove and replace existing access road o Coordination with other Contracts and Packages o Job site cleanup and proper disposal for work under this subcontract is to be carried out daily. o Maintenance of Record Drawings for all work under this subcontract, provide information to CMAR each month with application for payment. o All work to be coordinated with CMAR's Project Superintendent. o Payment and Performance bonds per Subcontract Agreement. o Equipment mobilization and demobilization. o Alternative 1 Scope: Modify Primary Treatment Diversion Unit Remove & replace Headwall etc. at Temporary Storage Unit Remove & replace Overflow Line o Alternative 2 Scope: Demo Headwall Cut and cap existing Overflow Line The Final Completion date is 220 Calendar Days from NTP You agree to furnish all equipment, material, labor, supervision and insurances for the Work Package #1 - Influent Line per specifications below for the Seis Lagos Wastewater Treatment Plant Upgrade Project Work Package #1 - Influent Line generally consists of the following: o Influent Line Complete o Alternative 1 o Alternative 2
Post-Bid
Water / Sewer
$200,000.00
Public - City
Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.