Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 5, 2024 at 8:00 PM
Updated September 6, 2024
Site work and new construction of a mixed-use development in West Harrison, Indiana. Completed plans call for the construction of a warehouse / distribution facility; for site work for a warehouse / distribution facility; and water / sewer project.
The Project will be constructed as one contract consisting of: Furnishing all materials, labor, and equipment as required to construct a new building for storage and to house a new control valve assembly to control flow to the St. Leon Elevated Water Storage Tank. Project includes building, piping and valves, site work along with SCADA and electrical work, complete. In addition to these items of work there are other miscellaneous items of work necessary and as specified to make this project complete. Location Details Site Address 7484 Christina Drive West Harrison IN Question Deadline 08/01/2024 To receive consideration, such questions shall be submitted in writing to the Engineer at least seven days before the advertised date for receipt of bids. If the question involves equality or use of products or methods, it must be accompanied by drawings, specifications, or other data, in sufficient detail to enable the Engineer to determine the equality or suitability of the product or method. In general, the Engineer will neither approve nor disapprove particular products prior to the opening of the bids; such products will be considered when offered by the Contractor for incorporation into the work The Project will be constructed as one, two, or three contracts. Owner reserves the right to issue one combined contract, or multiple contracts as Proposals "A", "B", & "C". Proposal "A" consisting furnishing all materials, labor, and equipment as required to construct a new building for storage. Project "A" includes concrete footings, foundation, floor slab, steel exterior walls & steel roof, doors, insulation, electrical unit heater, dehumidification equipment, & electrical complete along with a SCADA allowance. Addition to these items of work there are other miscellaneous items of work necessary and as specified to make this project complete. Proposal "B" consisting furnishing all materials, labor, and equipment asrequired to construct new ductile iron piping, fittings, and valves. Project "A" includes installation of cut-in tees, by-pass valve, a butterfly control valve, check valve, and air release valve. Addition to these items of work there are other miscellaneous items of work necessary and as specified to make this project complete. Proposal "C" consisting furnishing all materials, labor, and equipment as required to regrade site and provide new stone drive. Addition to these items of work there are other miscellaneous items of work necessary and as specified to make this project complete
Award
Warehouse / Distribution
$322,025.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
