BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

The Contractor shall furnish all necessary labor, materials, equipment, tools, and services required to complete the work as specified in the contract documents, specifically for the installation of a new Genetec Security Camera system for each school included in this bid package. This includes, but is not limited to, the procurement, delivery, installation, and proper functioning of all components necessary to achieve a complete and operational system. The Contractor shall ensure that all materials and equipment meet the specified standards and are suitable for their intended purposes. The Contractor is responsible for coordinating all aspects of the work to ensure timely and efficient completion of the work. Jones: 700 S State St Chicago Il 60605 Chicago Tech: 1301 W 14th St Chicago Il 60608 Douglass: 543 N Waller Ave Chicago Il 60644 Disney II: 3900 N Lawndale Ave Chicago Il 60618 Uplift: 900 W Wilson Ave Chicago Il 60640 Young: 211 S Laflin St Chicago Il 60607 Vaughn: 4355 N Linder Ave Chicago Il 60641 Northside Learning: 3730 W Bryn Mawr Ave Chicago Il 60659 Details and Requirements: 1) Materials and installation must comply with CPS Standards and Specifications as listed on a) Division 02 - Existing Conditions b) Division 26 - Electrical c) Division 27 - Communications d) Division 28 - Electronic Safety & Security 2) Contractor shall be solely responsible for performing their own takeoff and field-verifying dimensions. 3) Contractor must review and analyze all project documents, including drawings, specifications, and any other documents provided. Any errors, omissions, or inaccuracies in the Contractor's takeoff shall be the sole responsibility of the Contractor, and no additional compensation or time extensions shall be granted for such errors, omissions, or inaccuracies. 4) Change orders for base scope will not be accepted. For any additional scope of work not originally included in the Contract Documents, the Contractor's overhead and profit shall be limited to a maximum of fifteen percent (15%) for all change orders, amendments, or modifications to the original contract. Contractor shall provide a detailed breakdown of these costs for approval by CPS prior to commencing the additional work. 5) Contractor shall be responsible for obtaining and securing all necessary permits required for the completion of the project Question Deadline 08/16/202

Bid Results

Educational

$809,665.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
365
Active Projects
182
Bidding Soon
3,127
All Active Projects
1,343
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 20, 2024

September 19, 2024

img_map_placeholder

Multiple Locations, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.