Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 7, 2024 at 8:00 PM
Updated August 8, 2024
Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.
FY25 Bid Package 01 South SCOPE OF WORK Description: 1. Provide a complete wireless master clock system with secondary clocks. 2. 3. 4. 5. 6. 7. Supply clocks that use 120-Volt plug-in power to keep time. Provide 120-Volt power for the clocks as shown in the construction documents. Batteries within each clock are not acceptable. The clocks shall maintain correct synchronized time and transmit time-correction signals wirelessly from a clock transmitter to the secondary clocks. Example: Analog Synchronous Clocks should correct for minute and second hand synchronization at least once each hour. The clock system is independent from the intercom and bell program equipment. Provide for manual control of the programmed signal to the equipment. Regulate system timing functions backed up for power outages by an internal battery power, temperature-compensated crystal-controlled oscillator. Daylight Saving Time Correction done automatically. System shall be integrated and synchronized with Ethernet-Based Network Time Protocol (NTP) to reference atomic time base.
Bid Results
Educational
$287,425.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2024
October 7, 2024
Multiple Locations, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Aug 20 2024
Chicago, IL
Bid Date: Aug 13 2024
Chicago, IL
Bid Date: Aug 19 2022
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Aug 26 2024
Chicago, IL
Bid Date: Aug 20 2024
Chicago, IL
Bid Date: Aug 22 2024
Chicago, IL
Bid Date: Jul 30 2024
Chicago, IL
Bid Date: Jul 29 2024
Chicago, IL
Bid Date: Sep 03 2024
Chicago, IL
Bid Date: Sep 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
